My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/07/2017
CBCC
>
Meetings
>
2010's
>
2017
>
03/07/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:08:01 PM
Creation date
4/13/2017 12:51:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 2017-002 <br />St.David's Lane at Grand Harbor Water Services Replacement Project <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: March, 2017 <br />ATTACHMENT 1 <br />EFFECTIVE DATE: March 7, 2017 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT/ EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014 <br />PROJECT: St.David's Lane at Grand Harbor Water Services Replacement Project <br />COUNTY UTILITY PROJECT NO.: UCP #4130 CONTRACTOR'S PROJECT NO.: N/A <br />COUNTY WIP. No. <br />You are directed to proceed promptly with the following work: <br />Description: The project will consist of replacing approximately 42 single and double water services <br />serving the residences at St.David's Lane located in Grand Harbor. <br />Attachments: Attachment 2 <br />Method of determining Contract Price: , <br />© Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />© Lump Sum <br />m Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost (rounded) _ <br />$89,255.65 <br />Estimated <br />90 days from NTP <br />Contract Time: <br />ACCEPT <br />By: <br />Blue Goose Construction <br />Labor Contractor? -L% <br />Date: ,-I // —/ <br />RECOMMEDd WD! <br />By: <br />ArjunkVfelaBeee',P.E. <br />Capita I'llrojects Manager <br />Date: alga I n <br />APPROVED: <br />By: <br />COUNTY, CHAIRMAN <br />Joseph E. Flescher <br />Date: <br />C.\Uscm\sbusb\AppData\Local\Microsoft\Windows\Tcmpomry Intemet Files\Content.0utlook\8BETR4YV\Work Authorization No. 2017- <br />002.doc <br />P146 <br />
The URL can be used to link to this page
Your browser does not support the video tag.