My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/07/2017
CBCC
>
Meetings
>
2010's
>
2017
>
03/07/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:08:01 PM
Creation date
4/13/2017 12:51:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 2 ENGINEER <br />The Fischer Lake Island Water Assessment project has been designed by Gordon E. Sparks, P.E. <br />and administered/managed by Arjuna Weragoda, P.E., hereinafter called ENGINEER, and who is to <br />act as OWNER'S representative, assume all duties and responsibilities and have the rights and <br />authority assigned to ENGINEER in the Contract Documents in connection with completion of the <br />work in accordance with the Contract Documents. <br />ARTICLE 3 CONTRACT TIME <br />3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 15 calendar days from effective date of Notice;'to,.Proceed;>,.Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. ; <br />2. Receive approved shop drawings; for all materials an`d":d,Iuipment to be <br />utilized on the job. ;, <br />3. Perform all photographic recording and .documentati.on of conditions prior to <br />construction. f" <br />4. Locate all existing utilities in the area of wotk.. <br />5. Submit and secure approval;of shop drawings..' <br />6. Mobilize all labor,;equipment,.'and materials. u <br />7. Deliver and store 'alliequipmerif and materials to the job site. <br />8. Notify all utilities and, other affecied,�parties prior to initiating construction. <br />(b) From 16 calendar, days to 120` calendar days from the effective date of Notice to <br />Proceed, the'CONTRACTOR'"shall complete the following tasks: <br />1. lnstall'all'pipe:;and appurtenant items. <br />2. Perforftall testing. <br />:3." Restore all: disturbed areas to their pre -construction condition. <br />Correct all,.defciencies noted by Engineer. <br />Completion ofall -tasks ;outlined above (i.e., Subparagraphs a) and b) constitutes <br />;:Substantial Completion. <br />.c) .. From 1.21 calendar days to 150 calendar days from the effective date of Notice to <br />"Proceed�e CONTRACTOR shall complete the following tasks: <br />I Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />3.2 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute <br />Final Completion. <br />3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the <br />essence of this Agreement and that OWNER will suffer financial loss if the work is not <br />completed within the times specified in Paragraphs 3.1 and 3.2 above, plus any extensions <br />00530-2 <br />P152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.