My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/07/2017
CBCC
>
Meetings
>
2010's
>
2017
>
03/07/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:08:01 PM
Creation date
4/13/2017 12:51:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The intention is to have the subject maintenance performed during dry conditions and cooler <br />temperatures. <br />Staff requested price proposals from four contractors. Due to the unique and complex nature of the <br />project, two out of the four submitted a price proposal that did not include what staff and the consultant <br />was considering. Therefore, the lowest, responsive, responsible proposal was submitted by Timothy <br />Rose Contracting, Inc., for a lump sum amount of $73,700.00. <br />FUNDING: <br />Funding for the Cell 14 maintenance at West Regional Wastewater Treatment Facility is available in the <br />R&R account within the Utilities Operating Fund. Operating funds are derived from water and sewer <br />sales. <br />Description <br />Account Number <br />Amount <br />West WWTF Cattail Removal <br />47123536-044699-17514 <br />$73,700.00 <br />P162 <br />
The URL can be used to link to this page
Your browser does not support the video tag.