Laserfiche WebLink
access roads to SR60 and 66th Avenue, a bridge over the Lateral A canal, and a traffic signal at 66111, <br />Avenue and "18`h Street". These elements have been discussed by IRSC and the adjacent land owner <br />and both have agreed in concept upon a roadway design and access plan and property reconfiguration <br />(see attachment #7). This agreement in concept provides a new opportunity to jointly master plan the <br />County's major public college campus and adjacent property into a preferred development form <br />(mixed use). <br />As shown in the attached sketch, in concept IRSC and the private land owner would retain similar <br />acreage, with IRSC, the private land owner, and potential commercial development benefiting from <br />direct access and exposure on both SR 60 and 66th Avenue. IRSC would retain ownership of the <br />eastern portion, resulting in a more consolidated and better configured campus boundary, and as an <br />institutional use would serve to buffer the potential commercial uses from the residentially designated <br />neighborhoods located further east. While IRSC and the adjacent land owner have agreed in concept <br />to a potential roadway design and access plan, that plan is not part of the mixed use policy revisions. <br />Rather, attachment #6 merely serves to illustrate a possible component of a mixed use project in the <br />"SR 60/lRSC preferred location" that could be developed under the proposed mixed use policy <br />amendment. <br />If the mixed use policy amendment is approved, the "master plan" concept of the private land owner <br />and IRSC will need to be implemented through execution of appropriate documents to re -align <br />property ownership and the private land owner, in cooperation with IRSC, will need to apply for a <br />mixed use PD and obtain approval through the County's PD review process. With the proposed 80 <br />acre maximum size for a "preferred location" mixed use PD, a potential PD plan could serve as an <br />area "master plan" and simultaneously address land and infrastructure development on the east and <br />west sides of 66' Avenue and the western portion of IRSC's +/- 140 acre campus (see attachment <br />#8). The proposed amendment provides incentives for a developer to apply for one larger "master <br />plan" sized mixed use PD to cover both sides of 66th Avenue (as opposed to two separate PD's <br />covering each side of 66th Avenue separately) and to provide the significant level of shared <br />infrastructure improvements required under the proposed criteria. <br />As proposed, the mixed use policy will allow up to 50% of commercial development (not to exceed <br />15 acres) to occur before required SR 60 access and 66th Avenue access infrastructure improvements <br />are constructed or bonded -out. Allowing some significant commercial development to occur early on <br />in the project may allow the developer to more easily fund the shared access infrastructure costs <br />(perhaps $1.5 million - $2.5 million) and phase in development of the rest of the mixed use PD based <br />on market demand. <br />At the November 15, 2016 Board meeting and at the January 26, 2017 PZC meeting, a concern was <br />raised regarding completion of residential development in conjunction with completion of <br />commercial development within a "preferred location" mixed use project. Specifically, the concern <br />was raised that the entire commercial component could be developed with no obligation to complete <br />residential units within a set timeframe. Although the proposed amendment does not require <br />completion of residential units prior to completion of the commercial development, it does require <br />that prior to completion of more than 50% of the commercial area, the infrastructure serving the <br />residential portion of the project must be constructed or bonded -out and conceptual plan or final plan <br />approval must be obtained for all residential development. That restriction, as proposed, ensures at a <br />minimum that ready to build multi -family residential areas will be in place prior to completion of the <br />5 <br />P169 <br />