Consultant shall answer a reasonable number of requests for additional information and <br /> clarifications for the construction and installation of the water main, booster pump station and <br /> electrical system. Consultant will respond in written format in a timely manner. <br /> Consultant shall review shop drawings and submittals for conformance with the design <br /> documents. It is assumed that approximately twelve(i 2) submittals will be reviewed. <br /> Consultant will provide written comments and respond to Owner's contractor within a <br /> reasonable time. Consultant will endeavor to complete the reviews within a 2 week timeframe. <br /> Consultant will provide on-site observation of construction. It is assumed that up to twenty (20) <br /> half days of observation will be provided by a project engineer or resident inspector. <br /> Consultant will attend a preconstruction meeting. <br /> Consultant will attend and witness startup and operational testing of the booster pump station. <br /> Consultant will develop a punch-list of incomplete items based on our on-site observations and <br /> startup testing. Consultant will issue a written punch-list to Owner and contractor. Consultant <br /> will provide one(1) site visit to review follow up work on punchlist items. <br /> Consultant will attend and witness tie-in connections to existing reclaimed watermain and to the <br /> existing irrigation pump station at Crane Creek. <br /> Consultant will review contractor furnished record drawing information and operation and <br /> maintenance manuals (O&M)as required under the certification of completion. Consultant will <br /> review the record drawings and note substantial deviations on the certification form. <br /> Consultant will booster pump station into operation(FDEP Form 62-555.900(9)). Record <br /> drawing information will be provided by the contractors and included with the <br /> certification package. Four(4)hard copies and one electronic copy in pdf and Word format <br /> will be furnished to IRCU. <br /> TIME SCHEDULE <br /> Consultant will complete these tasks in a timely and mutually agreed upon schedule. It is <br /> anticipated that the following task schedule will be provided: <br /> TASK 1—SURVEY 45 days from NTP <br /> TASK 2—PREPARE DESIGN DWGS AND SPECS 100 Days after survey <br /> TASK 3—ELECTRICAL DESIGN 120 Days after survey <br /> TASK 4—PERMITTING 60 Days after Task 3 <br /> TASK 5A—BIDDING 60 Days after Task 4 <br /> TASK 5B—CONSTRUCTION PHASE SERVICES 210 Days after Task 5A <br />