My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-059
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 10:10:45 AM
Creation date
5/4/2017 10:10:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/02/2017
Control Number
2017-059
Agenda Item Number
8.F.
Entity Name
Florida East Coast Railroad
Subject
Construction of Utility Improvements
Subgrade water and forced main crossings
Area
69th St./ Old Dixie
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br /> @ E <br /> r <br /> b. Joints: Rubber and steel joint for prestressed <br /> pipe in accordance with-current Lock Joint Pipe <br /> Company Specification on SPS, or equivalent. <br /> Joints for bell and spigot and tongue and groove <br /> pipe to be in accordance with current standard <br /> practice. Joints may be made using confined <br /> continuous rubber gasket. <br /> 2. Cast Iron Pipe <br /> a. Materials: Pipe must conform to current ASTM <br /> Specification A142 for "Standard Pipe." <br /> b. Joints: Bell and spigot, caulked with lead and <br /> oakum, or and approved mechanical type. <br /> 3. Polyethylene Pipe <br /> a. Materials: Pipe must conform to current ASTM <br /> Specifications D2104, Schedule 40, for standard <br /> pipe. <br /> 4. Steel Pipe <br /> a. Materials: Pipe must conform to current ASTM <br /> Specification A120, Schedule 40. <br /> b. Joints: All joints must be welded or of an <br /> approved mechanical type. <br /> F. Carrier pipe with and internal pressure less that 30 psi <br /> shall have the ends of the casing pipe sealed after <br /> installation. <br /> G. Carrier pipe with and internal pressure of 30 psi and over <br /> shall have the casing pipe open at the ends if local <br /> conditions permit water from leaks to discharge into <br /> drainage ditch of manhole. If this is not practicable, the <br /> casing pipe shall be sealed at both ends and 4 inch relief <br /> vent provided at either end off the Railways right of way, <br /> which shall discharge into drainage ditch or sewer. <br /> -Easing pine shalt -lave a minimum inside diameter or 6.0 <br /> inches treater that the OWN= Rutside diameter ofthe <br /> carrier Dine, includim bg>> ends of flanges, <br /> H. Uncased high pressure gas pipe line crossings will be <br /> permitted provided they comply with the requirements of <br /> Chapter One, Part 5.2, Specifications for Uncased Gas <br /> Pipe Line within the Railway Right of Way (1993) , as is <br /> contained in the "Manual for Railway Engineers", issued by <br /> the American Railway Engineers Association", In the event of <br /> conflict the provisions of the "General Specifications for <br /> Subgrade and Above Grade Crossings of Railway's Right of <br /> Way" shall supersede. <br /> 4 <br /> „°, <br /> 77-71177"' <br /> sti17 <br /> df <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.