My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-060
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 10:27:16 AM
Creation date
5/4/2017 10:27:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/02/2017
Control Number
2017-060
Agenda Item Number
8.M.
Entity Name
Masteller & Moler
Subject
Courthouse Judges Security Upgrade
Work Order No.2
Area
Courthouse
Project Number
1621
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M L Engineering Inc. <br /> 2030 3711 Avenue <br /> Vero Beach,Florida 32960 <br /> Phone: (772)569-1257 <br /> Fax: (772)569-4041 <br /> EXHIBIT"B"—M L ENGINEERING, INC. FEE BREAKDOWN <br /> April 12, 2017 <br /> Mr. Steve Moler,P.E. <br /> Masteller&Moler,Inc. <br /> 1655 27t"Ave. Suite 2 <br /> Vero Beach,Florida 32960 <br /> Re: IRC Courthouse—Construction Administration <br /> Vero Beach,Florida <br /> Engineer's Project 16-210A <br /> Dear Steve: <br /> We are pleased to provide you with this proposal for structural engineering services on the above project. <br /> Our scope of work will be to provide construction administration services for the structural portion of the <br /> work for the proposed masonry screen walls at the East parking lot. <br /> Scope of Work includes: <br /> 1 Pre-bid meeting <br /> 2 Bid reviews <br /> 3 Pre-construction meeting <br /> 4 Submittal review of the following: <br /> a. Concrete mix design <br /> b. Masonry and accessories <br /> c. Reinforcing <br /> 5 Construction observation, limited to(4)on-site visits for the following: <br /> a. Foundation pre-pour. Verify compaction requirements are met, reinforcing size, quantity <br /> and placement <br /> b. Masonry walls.Verify and beam reinforcing, masonry placement, grouting and wall joints <br /> c. Concrete slab. Verify compaction requirements are met and reinforcing <br /> 6. Payment reviews <br /> 7. Final inspection <br /> The following services are not included in our scope: <br /> 1. Concrete or other material testing <br /> 2. Soil or compaction testing <br /> 3. Surveys <br /> 4. Permit fees <br />
The URL can be used to link to this page
Your browser does not support the video tag.