My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-039
CBCC
>
Resolutions
>
2010's
>
2017
>
2017-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 12:05:26 PM
Creation date
5/4/2017 12:05:23 PM
Metadata
Fields
Template:
Resolutions
Document Relationships
2017-055
(Cover Page)
Path:
\Resolutions\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY—DEPARTMENT OF UTILITY SERVICES <br /> r 1 <br /> PORTION COLLIER CREEK—HARBOR POINT WATER ASSESSMENT PROJECT <br /> PRELIMINARY ASSESSMENT ROLL—RESOLUTION 1 <br /> Parcel# 31-38-13-00007-0000-00019.0 Assessment= $6,250.00 <br /> Owner SAMUELSON, DAVID A AND SHERRY A <br /> Secondary <br /> Owner#1 <br /> Secondary <br /> Owner#2 <br /> Mailing Address 100 HARBOR POINT DR <br /> SEBASTIAN FL 32958 <br /> Legal HARBOR POINT SUB <br /> BLK/BLDG : <br /> LOT/UNIT: LOT 19 <br /> PBI/OR BK: PBI 14-77 <br /> Site Address 100 HARBOR POINT DR Revision Date: 4/6/2017 <br /> Parcel# 31-38-13-00007-0000-00020.0 Assessment= $6,250.00 <br /> Owner MCELWAIN, BLANE & NANCY <br /> Secondary <br /> Owner#1 <br /> Secondary <br /> Owner#2 <br /> Mailing Address 907 S FLEMING ST <br /> SEBASTIAN FL 32958 <br /> Legal HARBOR POINT SUB <br /> BLK/BLDG : <br /> LOT/UNIT: LOT 20 <br /> PBI/OR BK: PBI 14-77 <br /> Site Address 907 FLEMING ST Revision Date 4/6/2017 <br /> Parcel# 31-38-13-00007-0000-00021.0 Assessment= $6,250.00 <br /> Owner DODD,CHARLES E AND DENISE S <br /> Secondary ; <br /> Owner#1 <br /> Secondary <br /> Owner#2 <br /> Mailing Address 906 FLEMING ST <br /> SEBASTIAN FL 32958 <br /> Legal HARBOR POINT SUB <br /> BLK/BLDG : <br /> LOT/UNIT: LOT 21 <br /> PBI/OR BK: PBI 14-77 <br /> Site Address 906 FLEMING ST Revision Date 4/6/2017 <br /> F-\Utilities\UTILITY-Engineering\Projects-Assessment <br /> Projects\000Assessments_2017_Propose d\02 PortionCollierCreek_HarborPoint\WordDocument\01 PreliminaryAssessmentRoll_RESOLUTI0N_1 2_PortionCo11ierCreek_HarborPoin[ 03 24 <br /> 2017.docx <br /> Tuesday,April 18,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.