Laserfiche WebLink
The above -referenced professionals have <br />the 1991 Project to be as follows: <br />Golf Course <br />Design and Engineering <br />Construction (1) <br />Future Modifications <br />Maintenance Equipment <br />Grow -in Costs (2) <br />Other Structures and Improvements <br />Impact Fees <br />estimated the cost of <br />Sub -Total <br />Club House. Golf Cart Building and Maintenance <br />Design and Engineering <br />Clubhouse <br />Clubhouse Furnishings <br />Golf Cart Building <br />Maintenance Building <br />Land <br />Contingency <br />Sub -Total <br />$ 264,466 <br />2,121,308 <br />42,426 <br />190,000 <br />150,000 <br />172,500 <br />53.800 <br />Building <br />$2,994,500 <br />$ 43,200 <br />530,000 <br />50,000 <br />150,000 <br />110.000 <br />$ 883,200(3) <br />$ 482,000 <br />227.131 <br />Total $4,586,831 <br />(1) Excludes costs of stripping and plating and certain drainage <br />facilities. <br />(2) Excludes costs of certain survey work, electrical work, <br />landscaping and water supply wells and pumps, if needed. <br />(3) <br />Excludes cost of constructing parking lot expansion. <br />Construction is scheduled to begin in March of 1992 and the <br />new golf course and clubhouse facilities are expected to be fully <br />operational and ready for play in January of 1993. <br />18 <br />