Laserfiche WebLink
N <br />FINAL COST ESTIMATE FOR: <br />2ND STREET BETWEEN 24TH AVENUE AND 23RD AVENUE <br />INDIAN RIVER HEIGHTS SUBDIVISION <br />DATE: 7/30/91 <br />PROJECT 8847 <br />FINAL COST <br />Labor $998.96 <br />Equipment $1,120.00 <br />Asphalt $1,085.46 <br />Sod $864.00 <br />Pipe $133.17 <br />Limerock $1,985.13 <br />Stakes $4.50 <br />Testing $160.00 <br />$6,351.22 <br />$6,351.22 <br />ENGINEERING <br />Consulting Engineering <br />Construction <br />Stake Out <br />$953.I1 <br />$26.58 $212.64 <br />Administration 2.9841411 % <br />Recording Fee <br />75% Property Owner's Assessment <br />2% Tax Collector's Fee (75% Figure) <br />TOTAL ASSESSMENT <br />Assessment <br />$5,979,46 = <br />533.88 F.F. <br />51,165.75 $1.165.75 <br />Sub -Total $7,516.97 <br />5224.32 <br />$75.00 <br />TOTAL $7,816.29 <br />55,862.22 <br />5117.24 <br />$5,979.46 <br />$11.20 <br />