Laserfiche WebLink
FINAL COST ESTIMATE FOR: <br />13TH AVENUE BETWEEN 12TH & 14TH STREET — RIVENBARK SUBDIVISION <br />DATE: 7/19/91 <br />PROJECT NO. 8707 <br />FINAL COST <br />Labor $4,549.59 <br />Equipment *8,487.50 <br />Soil Cement $8,925.30 <br />Asphalt $7,127.79 <br />Sod $5,892.75 <br />Pipe *3,242.31 <br />Limerock *2,552.40 <br />Stakes $9.90 <br />Testing *200.00 <br />Pavement Markings 531.96 <br />$41,019.50 <br />$41,019.50 <br />ENGINEERING <br />Consulting Engineering <br />Construction <br />Stake Out <br />$4,611.40 <br />$26.58 3212.64 <br />$4,824.04 $4,824.04 <br />Sub -Total 345,843.54 <br />Administration 2.966394% <br />Recording Fee <br />51,359.90 <br />$500.00 <br />TOTAL. 547,703.44 <br />75% Property Owner's Assessment <br />2% Tax Collector's Fee (75% Figure) <br />TOTAL ASSESSMENT <br />*35,777.58 <br />$715.55 <br />$36,493.13 <br />Assessment = <br />