Laserfiche WebLink
FINAL COST ESTIMATE FOR: <br />12TH AVENUE BETWEEN 12TH STREET & 14TH STREET <br />DATE: 7/18/91 <br />PROJECT NO. 8821 <br />FINAL COST <br />Labor $7,851.01 <br />Equipment $13,903.00 <br />Soil Cement $3,373.05 <br />Asphalt $5,557.29 <br />Sod $3,033.00 <br />Pipe $1,841.67 <br />Limerock $3,295.15 <br />Catch Basins $1,720.00 <br />Curbing $4,648.00 <br />Stakes $13.14 <br />Testing 8300.00 <br />Miscellaneous $165.80 <br />FNOINEERINO <br />Consulting Engineering <br />Construction <br />Stake Out <br />Administration 2.9773703% <br />Recording Fee <br />$45,701.11 <br />8 hrs <br />75% Property Owner's Assessment <br />2% Tax Collector's Fee (75% Figure) <br />$3,716.96 <br />$26.58 $212.64 <br />TOTAL ASSESSMENT <br />$45,701.11 <br />$3,929.60 $3.929.60 <br />Sub -Total $49,630.71 <br />$1,477.69 <br />$500.00 <br />TOTAL $51,608.40 <br />$38,706.30 <br />$774.13 <br />839,480.43 <br />Assessment = $39,480.43 = <br />2521.1 F.F. <br />$15.66 <br />