My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-066
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 10:42:12 AM
Creation date
5/11/2017 10:42:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
05/09/2017
Control Number
2017-066
Agenda Item Number
8.M.
Entity Name
Blue Goose Construction
Subject
Water Main Replacement
Area
Heron Cay Mobile Park Longpointe Court
Project Number
2017-004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br /> WORK AUTHORIZATION DIRECTIVE <br /> No. 2017-004 <br /> Heron Cay Mobile Home Park: Longpointe Court Water Main Replacement Project <br /> BLUE GOOSE CONSTRUCTION <br /> DATE OF ISSUANCE:April 21, 2017 EFFECTIVE DATE: May 9, 2017 <br /> OWNER: Indian River County <br /> CONTRACTOR: Blue Goose Construction <br /> CONTRACT:WATER,SEWER AND RECLAIM WATER LINE REPLACEMENT/EXTENSIONS <br /> AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001,AWARDED September 9, 2014 <br /> PROJECT.:Longpointe Court Water Main Replacement +' <br /> COUNTY UTILITY PROJECT NO.: UCP#N/A CONTRACTOR'S PROJECT NO.: N/A U <br /> COUNTY WIP. No. 471-169000-17518 <br /> You are directed to proceed promptly with the following work: +, <br /> Description: Construct new water main to serve existing homes along Longpointe Court in Heron Cay v <br /> MHP and abandon the existing water main. Project includes the construction of new water services and 4-4 <br /> o <br /> connection of existing homes to new system. x <br /> a� <br /> Attachments:Attachment 3 <br /> U <br /> Method of determining Contract Price: <br /> IN Unit Prices: Bid Items as established pursuant to Bid No. 2015001,and awarded by the Board of <br /> County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. a <br /> Ed Lump Sum <br /> 0 Cost of the Work <br /> a� >1 <br /> The Cost of Labor, Contingency and Contract Time is summarized below: h a <br /> H <br /> Labor Cost (rounded)= $59,334.17 Estimated90 days from NTP w <br /> Contract Time: y; <br /> .V,��c�.M/S�•se <br /> ACCEP RECOMM LADED: APPROVED: <br /> •�: <br /> ?V1 <br /> BY: BY. � — 60sephE, FleschE!!r� <br /> Blue Goose Construction John M. Bo r, P.E. N Y,CHAIRMAIjI. <br /> Labor Contractor Utilities En ineer :?.--.. <br /> Date: 4 ` Date: 3 Date: May 9, 2017 <br /> APPROVED AS TO FORM <br /> AND LEGAL SUFFICjEj: jCy <br /> BY <br /> F•\Utilities\UTILITY-Engineering\Projects-Utility Construction Permits\[RC-Heron Cay-Longpointe WM8W1 Aft*W1,L"k <br /> Authorization No 2017-004.doe COUNTY ATT0 P i%,;U Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.