My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-151
CBCC
>
Resolutions
>
1990'S
>
1991
>
1991-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2017 3:01:02 PM
Creation date
5/15/2017 2:41:21 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1991-151
Approved Date
09/24/1991
Resolution Type
Utilities
Entity Name
Water and Sewer Revenue Bonds Series 1991
Subject
Bond Purchase Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Honorable Chairman and <br />Board of County Commissioners <br />9/16/91 <br />Page 14 <br />GREASE <br />The Wastewater Master Plan also projected the number of grease traps and <br />grease quantities in five-year increments from 1985 through the year 2005. <br />Table 2 presents these projections, which employ straight line interpolation <br />for intervening years. <br />Average daily grease quantities are also projected in Table 2 using a <br />generation rate of 2.000 gallons per grease trap per year. <br />PROPOSED TREATMENT FACILITY <br />The following is a detailed description of the proposed Regional Sludge <br />Facility. Figure 3 provides a schematic diagram of the processes to be used <br />at the facility. <br />DESIGN CRITERIA <br />The design of the Facility is based on flow projections for the year 2010. <br />However, due to cost effective considerations, the first stage of <br />construction is to the year 2000. Afterwhich, an expansion to this Facility <br />may be necessary. The expansion includes the addition of one new 2.0 meter <br />belt filter press. an extension of the conveyor system, and a minor expansion <br />of the process bay area located in the solids processing building. This <br />phase of the design includes consideration for an expansion as required by <br />EPA. The year 2000, parameters are used, and they incorporate maximum <br />monthly quantities to reflect peak loads anticipated at the Facility. Table <br />3 presents the design criteria used in sizing the Facility. <br />M.VRB2/5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.