Laserfiche WebLink
Honorable Chairman and <br />Board of County Commissioners <br />9/16/91 <br />Page 14 <br />GREASE <br />The Wastewater Master Plan also projected the number of grease traps and <br />grease quantities in five-year increments from 1985 through the year 2005. <br />Table 2 presents these projections, which employ straight line interpolation <br />for intervening years. <br />Average daily grease quantities are also projected in Table 2 using a <br />generation rate of 2.000 gallons per grease trap per year. <br />PROPOSED TREATMENT FACILITY <br />The following is a detailed description of the proposed Regional Sludge <br />Facility. Figure 3 provides a schematic diagram of the processes to be used <br />at the facility. <br />DESIGN CRITERIA <br />The design of the Facility is based on flow projections for the year 2010. <br />However, due to cost effective considerations, the first stage of <br />construction is to the year 2000. Afterwhich, an expansion to this Facility <br />may be necessary. The expansion includes the addition of one new 2.0 meter <br />belt filter press. an extension of the conveyor system, and a minor expansion <br />of the process bay area located in the solids processing building. This <br />phase of the design includes consideration for an expansion as required by <br />EPA. The year 2000, parameters are used, and they incorporate maximum <br />monthly quantities to reflect peak loads anticipated at the Facility. Table <br />3 presents the design criteria used in sizing the Facility. <br />M.VRB2/5 <br />