OWNER may make a Claim therefor as provided in <br />paragraph 10.05. If, however, such Work is not found <br />to be defective, CONTRACTOR shall be allowed an <br />increase in the Contract Price or an extension of the <br />Contract Times (or Milestones), or both, directly <br />attributable to such uncovering, exposure, <br />observation, inspection, testing, replacement, and <br />reconstruction. If the parties are unable to agree as to <br />the amount or extent thereof, CONTRACTOR may <br />make a Claim therefor as provided in paragraph <br />10 05 <br />13 05 OWNER May Stop the Work <br />A. If the Work is defective, or CONTRACTOR <br />TRACTOR to stop the Work, or any portion thereof, <br />not give rise to any duty on the part of OWNER to <br />cxcrcicc this right for the benefit of CONTRACTOR, <br />Supplier, any other individual <br />or entity, or any surety for, or employee or agent of <br />any -of -them. <br />13.06 Correction or Removal of Defective Work <br />A. CONTRACTOR shall correct all defective <br />Work, whether or not fabricated, installed, or <br />completed, or, if the Work has been rejected by ENGI- <br />NEER, remove it from the Project and replace it with <br />Work that is not defective. CONTRACTOR shall pay <br />all Claims, costs, losses, and damages (including but <br />not limited to all fees and charges of engineers, <br />architects, attorneys, and other professionals and all <br />court or arbitration or other dispute resolution costs) <br />arising out of or relating to such correction or removal <br />(including but not limited to all costs of repair or <br />replacement of work of others). <br />13 07 Correction Period <br />any applicable special guarantee required by the <br />Contract Documents, any Work is found to be <br />contemplated in paragraph 6.11.A is found to be <br />eibit <br />defective, and (iii) satisfactorily correct or repair or <br />from, If CONTRACTOR does not promptly comply <br />with the terms of such instructions, or in an <br />emergency where delay would cause serious risk of <br />loss or damage, OWNER may have the defective <br />Work corrected or repaired or may have the rejected <br />Work removed and replaced, and all Claims, costs, <br />losses, and damages (including but not limited to all <br />fees and charges of engineers, architects, attorneys, <br />and other professionals and all court or arbitration or <br />other dispute resolution costs) arising out of or relating <br />to such correction or repair or such removal and <br />replacement (including but not limited to all costs of <br />repair or replacement of work of others) will be paid by <br />CONTRACTOR. <br />B. - - - - - - - <br />item of equipment is placed in continuous service <br />WrittenAmendmenF <br />C Where defective Work (and damage to other <br />Work resulting therefrom) has been corrected or <br />removed and replaced under this paragraph 13.07, <br />the correction period hereunder with respect to such <br />Work will be extended for an additional period of one <br />year after such correction or removal and replacement <br />has been satisfactorily completed. <br />D CONTRACTOR's obligations under this <br />paragraph 13 07 are in addition to any other obligation <br />or warranty. The provisions of this paragraph 13.07 <br />shall not be construed as a substitute for or a waiver <br />of the provisions of any applicable statute of limitation <br />or repose. <br />13 08 Acceptance of Defective Work <br />A. If, instead of requiring correction or removal <br />and replacement of defective Work, OWNER (and, <br />prior to ENGINEER's recommendation of final pay- <br />ment, ENGINEER) prefers to accept it, OWNER may <br />do so. CONTRACTOR shall pay all Claims, costs, <br />losses, and damages (including but not limited to all <br />fees and charges of engineers, architects, attorneys, <br />and other professionals and all court or arbitration or <br />other dispute resolution costs) attributable to <br />OWNER's evaluation of and determination to accept <br />such defective Work (such costs to be approved by <br />00700 - General Conditions REV 5-10-13 <br />00700 - 37 <br />F'\Public Works\ENGINEERING DIVISION PROJECTS \1139 -CR 512 Wbnd Resurfacing -Roseland Rd to US 1-SCOP\Admim\bid documents\Master Contract Documents\00700 - General <br />Conditions REV 5-10-13.doc <br />