My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-056B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-056B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 10:10:21 AM
Creation date
5/16/2017 12:18:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/18/2017
Control Number
2017-056B
Agenda Item Number
12.F.1
Entity Name
Timothy Rose Construction
Subject
CR 512 Westbound Resurfacing
CR 512 Eastbound Resurfacing
Area
Roseland Road to US1 Easy St. to US1
Project Number
1139
Bid Number
2017034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
operation, safety, and protection of the Work, <br />and guarantees. <br />Unless OWNER and <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow CON- <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14 05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of <br />the Work, may be accomplished prior to Substantial <br />Completion of all the Work subject to the following <br />conditions. <br />1 OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />believes to be ready for its intended use and <br />substantially complete. If CONTRACTOR <br />agrees that such part of the Work is <br />substantially complete, CONTRACTOR will <br />certify to OWNER and ENGINEER that such <br />part of the Work is substantially complete and <br />request ENGINEER to issue a certificate of <br />Substantial Completion for that part of the <br />Work. CONTRACTOR at any time may notify <br />OWNER and ENGINEER in writing that <br />CONTRACTOR considers any such part of the <br />Work ready for its intended use and substan- <br />tially complete and request ENGINEER to issue <br />a certificate of Substantial Completion for that <br />part of the Work. Within a reasonable time <br />after either such request, OWNER, <br />CONTRACTOR, and ENGINEER shall make <br />an inspection of that part of the Work to <br />determine its status of completion. If <br />ENGINEER does not consider that part of the <br />Work to be substantially complete, ENGINEER <br />will notify OWNER and CONTRACTOR in <br />writing giving the reasons therefor. If <br />ENGINEER considers that part of the Work to <br />be substantially complete, the provisions of <br />paragraph 14 04 will apply with respect to <br />certification of Substantial Completion of that <br />part of the Work and the division of <br />responsibility in respect thereof and access <br />thereto. <br />2. No occupancy or separate operation <br />of part of the Work may occur prior to <br />compliance with the requirements of paragraph <br />5.10 regarding property insurance. <br />14 06 Final Inspection <br />A. Upon written notice from CONTRACTOR that <br />the entire Work or an agreed portion thereof is <br />complete, ENGINEER will promptly make a final <br />inspection with OWNER and CONTRACTOR and will <br />notify CONTRACTOR in writing of all particulars in <br />which this inspection reveals that the Work is <br />incomplete or defective. CONTRACTOR shall <br />immediately take such measures as are necessary to <br />complete such Work or remedy such deficiencies. <br />14.07 Final Payment <br />A. Application for Payment <br />1. After CONTRACTOR has, in the <br />opinion of ENGINEER, satisfactorily completed <br />all corrections identified during the final <br />inspection and has delivered, in accordance <br />with the Contract Documents, all maintenance <br />and operating- instructions, schedules, guaran- <br />tees, Bonds, certificates or other evidence of <br />insurance certificates of inspection, marked -up <br />record documents (as provided in paragraph <br />6.12), and other documents, CONTRACTOR <br />may make application for final payment follow- <br />ing the procedure for progress payments. <br />2. The final Application for Payment <br />shall be accompanied (except as previously <br />delivered) by: (i) all documentation called for in <br />the Contract Documents, including but not <br />limited to the evidence of insurance required by <br />subparagraph 5.04 B.7, (ii) consent of the <br />surety, if any, to final payment; and (iii) <br />complete and legally effective releases or <br />waivers (satisfactory to OWNER) of all Lien <br />00700 - General Conditions REV 5-10-13 <br />00700 - 41 <br />F'\Public Works\ENGINEERING DIVISION PROJECTS \1139 -CR 512 Wbnd Resurfacing -Roseland Rd to US 1-SCOPWdmim\bid documents\Master Contract Documents\00700 - General <br />Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.