Laserfiche WebLink
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: CR512 WESTBOUND RESURFACING (ROSELAND ROAD TO US1) AND CR512 <br />EASTBOUND RESURFACING (EASY STREET TO US1) <br />OWNER's Contract No. 1139 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />❑ Unit Prices <br />❑ Lump Sum <br />❑ Other. <br />❑ By Change Order <br />❑ Contractor's Records <br />D Engineer's Records <br />Q Other: <br />Q By Change Order <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />Substantial Completion. days; <br />Ready for Final Completion days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />By: <br />RECOMMENDED: <br />By: <br />APPROVED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />ENGINEER (Signature) <br />Date: <br />OWNER (Signature) <br />Date: <br />* * END OF SECTION * * <br />F;\Public Works\ENGINEERING DIVISION PROJECTS\1139-CR 512 Wbnd Resurfacing -Roseland Rd to US 1-SCOPWdmim\bid <br />documents\Master Contract Documents\00948 - Work Change Directive Rev 06-2013.doc <br />