My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-056B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-056B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 10:10:21 AM
Creation date
5/16/2017 12:18:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/18/2017
Control Number
2017-056B
Agenda Item Number
12.F.1
Entity Name
Timothy Rose Construction
Subject
CR 512 Westbound Resurfacing
CR 512 Eastbound Resurfacing
Area
Roseland Road to US1 Easy St. to US1
Project Number
1139
Bid Number
2017034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAINTENANCE OF RECORD DOCUMENTS: <br />1. Maintain in CONTRACTOR's field office in clean, dry, legible condition <br />complete sets of the following project documents: Drawings, Specifications, <br />Addenda, approved Shop Drawings, samples, photographs, Change Orders, <br />other modifications of Contract Documents, test records, survey data, Field <br />Orders, and all other documents pertinent to CONTRACTOR'S Work. <br />2. Provide files and racks for proper storage and easy access. <br />3. Make documents available at all times for inspection by ENGINEER and <br />OWNER. <br />4. Do not use record documents for any other purpose and do not remove them <br />from the field office. <br />5. Label each document "RECORD DRAWING" in 2 -inch high printed letters. <br />6. Keep record documents current at all times. <br />7. No work shall be permanently concealed until the required record data has <br />been obtained. <br />RECORD / AS -BUILT DRAWINGS <br />A. During the construction operation, the CONTRACTOR shall maintain records <br />of all deviations from the approved Project Plans and Specifications and shall <br />prepare therefrom "RECORD" drawings showing correctly and accurately all <br />changes and deviations from the work made during construction to reflect the work <br />as it was actually constructed. <br />B. The Record/As-Built survey shall be performed and subsequent plans <br />prepared by a Professional Surveyor and Mapper, registered in the state of Florida <br />and certified to the standards set forth in Chapter 472, Florida Statutes and Chapter <br />5J-17.050 Florida Administrative Code (Florida Minimum Technical Standards). <br />C. Field measurements of vertical or horizontal dimensions of constructed <br />improvements shall be obtained so that the constructed facility can be delineated in <br />such a way that the location of the construction may be compared with the <br />construction plans. Clearly shown by symbols, notations, or delineations, those <br />constructed improvements located by the survey. <br />D. All vertical information (elevations) provided on the Record Drawings shall be <br />referenced to the North American Vertical Datum of 1988 (NAVD 88) unless <br />otherwise specified by the Project Engineer. <br />E. The horizontal information provided on the Record Drawings shall be referenced to <br />the State of Florida, State Plane Coordinate System, Florida East Zone as <br />established by Global Positioning System (GPS) which meets or exceeds Third <br />Order Class I Accuracy Standards according to current publication of the Federal <br />Geodetic Control Committee (FGCC) procedures. <br />01025-2 Technical Specifications <br />F•\Public Works\ENGINEERING DIVISION PROJECTS\1139-CR 512 Wbnd Resurfacing -Roseland Rd to US 1-SCOP\Admin\bid <br />documents\Master Contract Documents\Technical Specifications REVISED.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.