My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-056B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-056B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 10:10:21 AM
Creation date
5/16/2017 12:18:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/18/2017
Control Number
2017-056B
Agenda Item Number
12.F.1
Entity Name
Timothy Rose Construction
Subject
CR 512 Westbound Resurfacing
CR 512 Eastbound Resurfacing
Area
Roseland Road to US1 Easy St. to US1
Project Number
1139
Bid Number
2017034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor shall be responsible for performing daily inspections, including <br />weekends and holidays, with some inspections at nighttime, of the installations on the <br />project and replace all equipment and devices not conforming with the approved <br />standards during that inspection. The project personnel will be advised of the <br />schedule of these inspections and be given the opportunity to join in the inspection as <br />is deemed necessary. <br />C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design, <br />Construction, Maintenance and Utility Operations On The State Highway System, <br />Edition as dated on the plans set forth the basic principles and prescribes minimum <br />standards to be followed in the design, application, installation, maintenance and <br />removal of all traffic control devices and all warning devices and barriers which are <br />necessary to protect the public and workmen from hazards within the project limits. <br />The standards established in the aforementioned manual constitute the minimum <br />requirements for normal conditions, and additional traffic control devices warning <br />devices, barriers or other safety devices will be required where unusual, complex or <br />particularly hazardous conditions exist. <br />The above referenced standards were developed using F.H.W.A., U.S.D.O.T. Manual <br />on Uniform Traffic Control Devices (MUTCD). <br />D. TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - <br />INSTALLATION: The responsibility for installation and maintenance of adequate traffic <br />control devices, warning devices and barriers, for the protection of the travel in public <br />and workmen, as well as to safeguard the work area in general shall rest with the <br />Contractor. Consideration shall be given to recommendations of the Engineer. The <br />required traffic control devices, warning devices and barriers shall be erected by the <br />Contractor prior to creation of any hazardous condition and in conjunction with any <br />necessary re-routing of traffic. The Contractor shall immediately remove, turn or cover <br />any devices or barriers which do not apply to existing conditions. All traffic control <br />devices shall conform to MUTCD standards and shall be clean and relatively <br />undamaged. Damaged devices diminishing legibility and recognition, during either <br />night or day conditions, are not acceptable for use. <br />E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br />manner that no undue hazard will result due to the requirements of this article, and the <br />procedures and policies described therein shall in no way act as a waiver of any of the <br />terms of the liability of the Contractor or his surety. <br />F. In addition to above, the Contractor shall comply with INDIAN RIVER COUNTY <br />TRAFFIC ENGINEERING DIVISION SPECIAL CONDITIONS FOR RIGHT-OF-WAY <br />CONSTRUCTION in Appendix C. <br />01025-11 Technical Specifications <br />F•\Public Works\ENGINEERING DIVISION PROJECTS\1139-CR 512 Wbnd Resurfacing -Roseland Rd to US 1-SCOP\Admin\bid <br />documents\Master Contract Documents\Technical Specifications REVISED.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.