My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-056B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-056B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 10:10:21 AM
Creation date
5/16/2017 12:18:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/18/2017
Control Number
2017-056B
Agenda Item Number
12.F.1
Entity Name
Timothy Rose Construction
Subject
CR 512 Westbound Resurfacing
CR 512 Eastbound Resurfacing
Area
Roseland Road to US1 Easy St. to US1
Project Number
1139
Bid Number
2017034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
control measures that may be implemented, application of polyacrylamide is required <br />on all such disturbed areas within 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased, unless final landscaping has been <br />installed. Polyacrylamide application shall be as specified herein. Include <br />polyacrylamide application in the Project's SWPPP. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required until the system <br />is no longer needed. If a water quality violation occurs, immediately cease all work <br />contributing to the water quality violation and correct the problem. Immediately report <br />all water quality violations to the OWNER. Immediately report the discharge of any <br />hazardous substance to the State Warning Point at 800-320-0519 or 850-413-9911. <br />E. Discharge shall not violate State or local water quality standards in receiving waters, <br />nor cause injury to the public health or to public or private property, nor to the Work <br />completed or in progress. The receiving point for water from construction operations <br />shall be approved by the applicable owner, regulatory agency, and the ENGINEER. <br />The receiving point shall be shown on the Project SWPPP. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />B. Approved Stormwater Pollution Prevention Plan. <br />C. "Contractor's Affidavit Regarding Erosion Control and Treatment of Dewatering Water <br />and Stormwater From Construction Activities" <br />1.5 STORMWATER TREATMENT AND EROSION CONTROL SYSTEM <br />RESPONSIBILITY <br />A. Prepare a site-specific design of the erosion and stormwater pollution control system. <br />Install and maintain all erosion and stormwater pollution control devices under the <br />supervision of a State Certified Stormwater, Erosion, and Sedimentation Control <br />Inspector. Maintain the erosion and stormwater pollution control devices until in the <br />ENGINEER's sole opinion, the devices are no longer necessary (such time not to <br />extend past the date the OWNER formally accepts the project as complete). Before <br />beginning construction, submit to Indian River County, Florida Department of <br />Environmental Protection (FDEP) and other applicable regulatory agencies for review <br />and approval, a Stormwater Pollution Prevention Plan (SWPPP), prepared by the <br />certified erosion control subcontractor. Construction shall not begin until the SWPPP <br />has been approved by Indian River County, FDEP, and all applicable regulatory <br />agencies. Submit the approved SWPPP to the ENGINEER before beginning <br />construction. Include in the SWPPP, the "Contractor's Affidavit Regarding Erosion <br />01025-14 Technical Specifications <br />F\Public Works\ENGINEERING DIVISION PROJECTS\1139-CR 512 Wbnd Resurfacing -Roseland Rd to US 1-SCOP\Admin\bid <br />documents\Master Contract Documents\Technical Specifications REVISED.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.