My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-056B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-056B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 10:10:21 AM
Creation date
5/16/2017 12:18:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/18/2017
Control Number
2017-056B
Agenda Item Number
12.F.1
Entity Name
Timothy Rose Construction
Subject
CR 512 Westbound Resurfacing
CR 512 Eastbound Resurfacing
Area
Roseland Road to US1 Easy St. to US1
Project Number
1139
Bid Number
2017034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and stored in the County's Storage Yard if they are deemed salvageable by the <br />Engineer. The excavated materials shall be removed from the job site and disposed in <br />a location designated or approved by the Owner. Any culverts, structures or any <br />material excavated or removed from the project site under clearing and grubbing <br />deemed unsalvageable by the Engineer shall be disposed of in a legal manner by the <br />Contractor. Where required, suitable material as approved by the Engineer shall then <br />be backfilled and compacted to restore the original contour of the ground. The fill <br />material shall be backfilled and compacted in accordance with Section 120 of these <br />specifications. <br />H. No additional payment will be made, nor will additional work, or change orders be <br />authorized for work needed to remove, relocate, protect, or otherwise account for in <br />the construction of the work depicted in the plans, for any feature, or item that would <br />be apparent from a careful inspection of the site and review of the plans, even though <br />such feature or item is not specifically called out in the plans. It is therefore essential <br />the contractor make such inspection and review. <br />I. The unit price bid for this item shall include the cost of all labor, tools, and equipment <br />necessary to excavate, remove, and dispose of those items as directed by the <br />Engineer and where designated on the Drawings. The cost of restoration and backfill <br />and compaction for the specific area of removal shall also be included under this item. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 110-1-1 - Clearing and Grubbing — Per Lump Sum <br />SECTION 160 - STABILIZING <br />The work specified in this item shall conform to Section 160 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 160-4 — Refurbish Stabilized Shoulder, (LBR40), (6" Thick) — Per Square <br />Yard <br />SECTION 285 — OPTIONAL BASE COURSE <br />(FULL DEPTH RECLAMATION) <br />DESCRIPTION - This work is the in-place construction of a Reclaimed Asphalt Base Course, <br />using either reclaimed asphalt pavement (RAP) material and/or reclaimed aggregate material <br />(RAM), and existing road base material combined with virgin aggregates and/or bituminous <br />material. It is the intent of this contract to recycle 100% of the existing asphalt pavement and <br />01025-23 Technical Specifications <br />F•\Public Works\ENGINEERING DIVISION PROJECTS\1139-CR 512 Wbnd Resurfacing -Roseland Rd to US 1-SCOP\Admin\bid <br />documentsWaster Contract Documents\Technical Specifications REVISED.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.