Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Timothy Rose Contracting, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1 01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents The Work is generally described as follows: <br />The proposed improvements to CR512 consist of refurbishing (full depth <br />reclamation) of the dual westbound lanes from Roseland Road to US1 and eastbound <br />lanes from Easy Street to US1. Also included with the project is the installation of <br />vehicular detector assemblies and the signing and marking of the proposed resurfaced <br />lanes. This is a F.D.O. T. Small County Outreach Program (SCOP) funded project, FM No. <br />4331160-1-58-01. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: CR512 WESTBOUND RESURFACING (ROSELAND ROAD TO <br />US1) AND CR512 EASTBOUND RESURFACING (EASY STREET TO US1) <br />County Project Number 1139 <br />Bid Number: 2017034 <br />FM No.. 431160-1-54-01 <br />Project Address: CR512, Sebastian, Florida 32958 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />00520 - Agreement (Public Works) REV 06-14 <br />00520 - 2 <br />F'\Purchasing \Bids\2016-2017 FY (2017000)\2017034 CR512 Resurfacing to US 1\00520 -Agreement (Public Works) REV 06-14.doc <br />