My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-056B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-056B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 10:10:21 AM
Creation date
5/16/2017 12:18:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/18/2017
Control Number
2017-056B
Agenda Item Number
12.F.1
Entity Name
Timothy Rose Construction
Subject
CR 512 Westbound Resurfacing
CR 512 Eastbound Resurfacing
Area
Roseland Road to US1 Easy St. to US1
Project Number
1139
Bid Number
2017034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents and check and verify pertinent <br />figures therein and all applicable field measurements. <br />CONTRACTOR shall promptly report in writing to <br />ENGINEER any conflict, error, ambiguity, or <br />discrepancy which CONTRACTOR may discover and <br />shall obtain a written interpretation or clarification from <br />ENGINEER before proceeding with any Work affected <br />thereby; however, CONTRACTOR shall not be liable <br />to OWNER or ENGINEER for failure to report any <br />conflict, error, ambiguity, or discrepancy in the <br />Contract Documents unless CONTRACTOR knew or <br />reasonably should have known thereof. <br />B Preliminary Schedules: Within ten days after <br />the Effective Date of the Agreement (unless otherwise <br />specified in the General Requirements), CONTRAC- <br />TOR shall submit to ENGINEER for its timely review. <br />1 a preliminary progress schedule <br />indicating the times (numbers of days or dates) <br />for starting and completing the various stages <br />of the Work, including any Milestones specified <br />in the Contract Documents; <br />2. a preliminary schedule of Shop <br />Drawing and Sample submittals which will list <br />each required submittal and the times for sub- <br />mitting, reviewing, and processing such <br />submittal; and <br />3 a preliminary schedule of values for <br />all of the Work which includes quantities and <br />prices of items which when added together <br />equal the Contract Price and subdivides the <br />Work into component parts in sufficient detail to <br />serve as the basis for progress payments <br />during performance of the Work. Such prices <br />will include an appropriate amount of overhead <br />and profit applicable to each item of Work. <br />C. Evidence of Insurance: Before any Work at <br />the Site is started, CONTRACTOR and OWNER shall <br />each deliver to the other, with copies to each <br />Conditions, certificates of insurance (and other <br />ciidence of insurance which either of them or any <br />CONTRACTOR and OWNER respectively arc <br />Article 5. <br />2.06 Preconstruction Conference <br />A. Within 20 days after the Contract Times start <br />2 07 Initial Acceptance of Schedules <br />A. Unless otherwise provided in the Contract <br />Documents, at least ten days before submission of the <br />first Application for Payment a conference attended by <br />CONTRACTOR, ENGINEER, and others as appropri- <br />ate will be held to review for acceptability to ENGI- <br />NEER as provided below the schedules submitted in <br />accordance with paragraph 2.05.B. CONTRACTOR <br />shall have an additional ten days to make corrections <br />and adjustments and to complete and resubmit the <br />schedules. No progress payment shall be made to <br />CONTRACTOR until acceptable schedules are <br />submitted to ENGINEER. <br />1 The progress schedule will be <br />acceptable to ENGINEER if it provides an <br />orderly progression of the Work to completion <br />within any specified Milestones and the <br />Contract Times. Such acceptance will not <br />impose on ENGINEER responsibility for the <br />progress schedule, for sequencing, scheduling, <br />or progress of the Work nor interfere with or <br />relieve CONTRACTOR from CONTRACTOR's <br />full responsibility therefor <br />2. CONTRACTOR's schedule of Shop <br />Drawing and Sample submittals will be <br />acceptable to ENGINEER if it provides a <br />workable arrangement for reviewing and <br />processing the required submittals. <br />3 CONTRACTOR's schedule of values <br />will be acceptable to ENGINEER as to form <br />and substance if it provides a reasonable <br />allocation of the Contract Price to component <br />parts of the Work. <br />ARTICLE 3 - CONTRACT DOCUMENTS. INTENT, <br />AMENDING, REUSE <br />3 01 Intent <br />A. The Contract Documents are comple- <br />mentary; what is called for by one is as binding as if <br />called for by all. <br />B It is the intent of the Contract Documents to <br />describe a functionally complete Project (or part there- <br />of) to be constructed in accordance with the Contract <br />00700 - General Conditions REV 5-10-13 <br />00700 - 9 <br />F'\Public Works\ENGINEERING DIVISION PROJECTS \1139 -CR 512 Wbnd Resurfacing -Roseland Rd to US 1-SCOP\Admim\bid documents\Master Contract Documents\00700 - General <br />Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.