Laserfiche WebLink
Pay APPIWall e'Atr5ouR1 CWAIY Pak OwratW PMI4 RC PROJECT NO. 1425 <br />PAM Na <br />SCHEDULED VALUE <br />PREVIOUS APPLICATION <br />THIS PERIOD <br />TOTAL COMPLETED <br />% • <br />MATERIALS <br />BALANCE 70 FINISH <br />101-1 <br />MOBILIZATION <br />IS <br />I <br />25,000•W <br />25,000.00 <br />2.00 <br />25,000.00 <br />0.00 <br />0.00 <br />LOD 25,000.00 <br />100.00% <br />0.00 <br />0600 <br />0.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />LS <br />2 <br />4000.00 <br />4,000.0) <br />LW <br />4,000,00 <br />0.00 <br />0.00 <br />1.00 4,000.00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />109.13 <br />SILT FENCE -TYPE III <br />LF <br />L820 <br />090 <br />163800 <br />1=00 <br />1638,00 <br />0.00 <br />Moo <br />3,820.00 1,638.00 <br />300.00% <br />0.00 <br />0.00 <br />0.00 <br />10415 <br />SOILTRACIONG DEVICE <br />EA <br />1 <br />2,120.00 <br />2,32MOO <br />LOO <br />2,120,00 <br />0.00 <br />0.00 <br />1.00 2,]70.00 <br />100.00% <br />MOD <br />0.00 <br />0.00 <br />110.1-1 <br />CLEARING AND GRUBBING 21 ACRES <br />IS <br />I <br />32.111,00 <br />32,11L00 <br />LOO <br />32,11L00 <br />0.00 <br />MW <br />LOO 32,11100 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />110.7 <br />REMOVE OUR% SIDEWALK & SHELL ROAD <br />LS <br />i <br />3,718.00 <br />3,71800 <br />Loa <br />3,718.00 <br />0600 <br />0.00 <br />LOO 3,71800 <br />100.00% <br />MOD <br />0.00 <br />0.00 <br />120.3 <br />IMPORT ALL FROM ONS,COUNTY SE SOUTION CE L2( SEE DIVISION <br />TECHNICAL PROVISIONS, SECTION 120 FOR DETAILS <br />Cy <br />5000 <br />5.00 <br />25,000.00 <br />5,000.00 <br />25,000.00 <br />0.00 <br />MW <br />5,000.00 25,000.00 <br />100.00% <br />MAD <br />0.00 <br />0.00 <br />120.2-2 <br />IMPORT FILL IM PORT, PLACE AND GRAD <br />CY <br />14,600 <br />725 <br />303,850'00 <br />14,600.00 <br />105,850.00 <br />MOD <br />0.00 <br />14,600,00 105,850,00 <br />100.00% <br />MW <br />0.00 <br />MOD <br />285.704 <br />SHELL ROADWAY -S' <br />SY <br />930 <br />9.00 <br />8,370.00 <br />930.00 <br />8,37040 <br />MOO <br />0.00 <br />93040 8,370.00 <br />100.00% <br />04D <br />MOD <br />0.00 <br />425-1.55-1 <br />INLET, DT BOTTOM TYPE <br />EA <br />5 <br />2,900.0) <br />14500.00 <br />5.00 <br />14,500.00 <br />MOD <br />0.00 <br />5.00 14,500.00 <br />100.00% <br />0.00 <br />MOD <br />0.00 <br />430.175-115 PIPE CULVERT, 35° (CAP( <br />LF <br />252 <br />40.00 <br />10,080.00 <br />252.W <br />]0,080.00 <br />0.00 <br />0.00 <br />25200 1Q080.o0 <br />100.00% <br />MOD <br />0.00 <br />0.00 <br />430.175.118 • PIPE CULVERT; IW (CAP) <br />LF <br />240 <br />45,00 <br />30,800.00 <br />240.00 <br />10,800.00 <br />0.00 <br />0.00 <br />240.00 10,800.00 <br />100.00% <br />0.00 <br />0.00 <br />Moo <br />430475.235 PIPE CULVERT, 12'%18` ERCP <br />EA <br />60 <br />S'oo <br />3,12000 <br />60,00 <br />3,120.00 <br />0.00 <br />0.00 <br />60.00 3,120.00 <br />100.00% <br />MOD <br />0.00 <br />0.00 <br />430.994-M MITERED END SECTION, unar (ERCP <br />EA <br />2 <br />870.00 <br />1,740.00 <br />200 <br />1740,00 <br />0.00 <br />0.00 <br />200 1,740,00 <br />200.00% <br />O.OD <br />0.00 <br />0.00 <br />522-2 <br />CONCRETE DRIVEWAY-6°THICK <br />SY <br />226 <br />50.00 <br />8,300,00 <br />126,00 <br />61300,00 <br />0.00 I <br />MOD <br />126.00 6,300.00 <br />300.00% <br />0.00 <br />MOD <br />0.00 <br />S70.1 <br />SOD BAHIA <br />SY <br />25,27) <br />1.75 <br />44,135.00 <br />25,220.00 <br />44,13100 <br />0.00 <br />moo <br />25,220.00 44,135.00 <br />100.00% <br />0.00 <br />Moo <br />0.00 <br />700-1-11 <br />STOP SIGN -30•R1-1 <br />VT, <br />I <br />325.00 <br />325.00 <br />MOD <br />0.00 <br />LOD <br />325.00 <br />L00 325.00 <br />IMAM <br />OAD <br />0.00. <br />0.00 <br />711-11-125 <br />THERMOPLASTIc-24"SOUD WHITE <br />LF <br />10 <br />SS40 <br />moo <br />MOO <br />0.00 <br />10.00 <br />SSMW <br />11100 550.00 <br />100.00% <br />oW <br />MOD <br />0.00 <br />Loft <br />CO01-CREDIT STOP SIGN &TERMOPL40C <br />L5 <br />SUBTOTAL <br />I <br />f <br />^8'm I <br />SUBTOTAL I <br />-875,00 <br />29M8200 ISUWMALI <br />0.00 <br />0.00 <br />298982,00 <br />LOO <br />SUBTOTAL <br />-875.00 <br />0.00 <br />Loo 875.00 <br />SUBTOTAL ZMWOZM <br />100AX% <br />SUBTOTAL <br />0.0) <br />OAO <br />0.00 <br />SUBTOTAL <br />0.00 <br />0.0) <br />FORCEAC=?a <br />SQODM00 <br />SOAOM00 <br />TOTAL <br />I <br />TOTAL <br />34SAW-00 <br />TOTAL <br />29SAUM *'TOTAL. <br />0.00 <br />TOTAL 2NA37-00 <br />TOTAL <br />CAO <br />TOTAL <br />50,000.00 <br />- <br />4 <br />' <br />AMOUNT COMPLETED TO DATE <br />MATERIALS STORED TO DATE <br />SUB, -TOTAL MATERIALS STORED AND COMPLETE TO DATE$MABLW <br />RETAINAGE OF WORK COMPLETED AT 0% <br />TOTAL COMPLETED AND STORED LESS RETAINAGE <br />LESS PREVIOUS PAYMENT <br />AMOUNT WE CONTRACTOR <br />$0.00 <br />$0.00 <br />$ <br />$M,557.901 <br />$14,91Z4,201 <br />I <br />r <br />1 <br />V <br />