My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/11/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
04/11/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:24:35 PM
Creation date
5/22/2017 11:15:06 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/11/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a pre-treatment protocol for the Biosolids facility before sending the centrate to West WWTF, there could <br />be costly capital investment requirements and higher 0&M costs associated with a pre-treatment plant at <br />the Biosolids facility. Current rates are too low to accommodate any additional treatment modalities that <br />may be required. <br />The consent order has been drafted to ensure that future permit exceedances are addressed in a timely <br />manner. The FDEP allows for an in-kind penalty offset to the proposed fines attached to the order. Due to <br />the erratic influent loadings, the consultant recommended IRCDUS purchase an online total phosphorus <br />monitoring instrument and a hand-held field oxidation reduction potential probe to assist the West Regional <br />WWTF plant operators in changing treatment processes in a timely manner to address the fluctuations in the <br />waste loads. Staff has initial FDEP confirmation that this proposed in-kind offset is allowable. <br />Within 60 days of the signing of the consent order, the County must pay the FDEP $500 in administrative fees <br />for costs incurred by the FDEP regarding this permit -related matter. <br />FUNDING: <br />Funding for the FDEP administrative fee of $500.00 is available in the Utilities operating fund under the <br />License and Permits account 47121836-034970. Since the need for the two pieces of equipment was not <br />identified prior to the compilation of the fiscal year 2016-17 budget, funds in the amount of $32,926.05 to <br />purchase these items will come from the Other Equipment account 471-166002, which is funded from the <br />cash balance. Although there are currently funds available for the Other Professional Services account <br />47125736-033190, this unbudgeted $29,900.00 expense may cause the need for a future budget amendment <br />as well. Operating funds are derived from water and sewer sales. <br />Description <br />Account No. <br />Amount <br />License and Permits <br />47121836-034970 <br />$ 500.00 <br />Other Equipment <br />471-166002 <br />$32,926.05 <br />Other Professional Services <br />47125736-033190 <br />$29,900.00 <br />RECOMMENDATION: <br />Staff recommends that the Board of County Commissioners: <br />A. Authorize the Chairman to execute Consent Order 17-0072. <br />B. Authorize staff to pay the $500 administrative fee to the FDEP within 60 days of the effective <br />date of the Order. <br />C. Waive the requirements for bids and authorize the Purchasing Manager to issue a Purchase <br />Order for a lump sum amount of $32,926.05 to Hach for the in-kind equipment <br />purchase/penalty offset, upon FDEP approval. <br />D. Waive the requirements for bids and authorize the Purchasing Manager to issue a Purchase <br />Order to CH2M Hill for a lump sum of $29,900 for process engineering consulting services at the <br />biosolids facility. <br />ATTACHMENT: <br />1. Consent Order 17-0072 <br />2. Price Proposal from Hach <br />3. Price proposal for consulting services from CH2M <br />C:\Users\GRANIC-1\AppData\Local\Temp\BCL Tech nologies\easyPDF 7\@BCL@00062301\@ BCL@00062301.docx <br />P44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.