My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/18/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
04/18/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:28:02 PM
Creation date
5/22/2017 11:31:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/18/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive No. 01 <br />DATE OF ISSUANCE: January 18, 2016 EFFECTIVE DATE: January 18, 2016 <br />OWNER: Indian River County <br />CONTRACTOR: Kerns Construction & Property Management Corporation <br />Project: 87th Street and 911 Avenue Sidewalk Improvements <br />OWNER's Project No. 1205 <br />OWNER's Contract No. 2015036 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Revisions to the drainage improvements on 87th Street due to the existing drainage pattern. <br />The relocation of the sidewalk from the north side of 87th Street to the south side from station <br />82+00 to 98+00. Revisions to the drainage quantities and the addition of several quantity line <br />items. <br />Purpose of Work Change Directive: <br />To address the existing drainage pattern on 87th Street that was not accounted for with the <br />original design. <br />Attachments: (List documents supporting change) <br />Revised plans for 87th Street (Sheets 6 through 13 and 19 through 33) dated 1/14/16 <br />Revised Itemized Bid Schedule dated 1/18/16 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />X Unit Prices <br />❑ Lump Sum <br />❑ Other: <br />II By Change Order: <br />Method of determining change in <br />Contract Times <br />❑ Contractor's Records <br />❑ Engineer's Records <br />X_Other: Material Acquisition for Drainage Inlets <br />II By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$23.301.30 Substantial Completion: 35 additional days; 4/27/16 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Ready for Final Completion. 5/27/16 <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED: <br />By: <br />RECOMMENDED: <br />By: <br />ENGINEER (Signature) <br />APP774 <br />By: <br />CONTRACTOR (Signatuure) <br />-OWNER (Signature) <br />Date: I I Int 20l <br />Date: / �g 1-6 <br />Date: a 6 <br />FAPublic WorksIENGINEERING DIVISION PROJECTS\1205-Vero Lake Estates Swk-87th St 101st Ave to CR510 (LAP)\Design\Work <br />Change Directives\WCD #1\00948 -Work Change Directive Rev 06-2013.doc <br />P106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.