My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/18/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
04/18/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:28:02 PM
Creation date
5/22/2017 11:31:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/18/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Extended Roadway Grid Network: Per Policy 3.8 of the Transportation Element of the <br />County Comprehensive Plan, the County must consider protection of the extended roadway grid <br />network during the site plan review and approval process. The applicant has provided an <br />extended roadway grid network exhibit showing all potential extended roads that may cross the <br />site at some time in the future (4th Street, lst Street SW, 5th Street SW, 9th Street SW/Oslo Road, <br />and 98th Avenue). Please see attachment 5. The provided exhibit shows alternate corridor <br />alignments for two potential extended road locations (1St Street SW and 5th Street SW). Those <br />alternate alignments correspond with the proposed on-site stabilized access paths, and are clear <br />of proposed solar panel arrays. Staff has reviewed the proposed alternate corridor alignments <br />and has confirmed that those alignments provide adequate protection for the extended roadway <br />grid network, as shown on the project site plan. <br />13. Specific Land Use Criteria: Pursuant to LDR section 971.44(2), the following criteria for <br />private heavy utilities apply to this project: <br />Per Chapter 901, the definition of utilities, public and private — heavy includes "all <br />major electrical generation plants (generating fifty (50) megawatts or more), major <br />sewage treatment and disposal facilities, and major water purification plants; " <br />Note: The proposed use (Blue Cypress Solar Energy Center) will generate 74.5 <br />megawatts of power and meets the definition of a private heavy utility. <br />2. Any power generation facility shall be consistent with the provisions of the Florida <br />Electrical Power Plan Citing Act, Chapter 23, Section 23.09191 F. S.; <br />Note: The proposed solar energy center will have a maximum gross capacity of <br />74.5 megawatts which is less than the 75 megawatt threshold. The proposed <br />facility is therefore exempt from the Florida Electrical Power Plant Siting <br />Act. <br />3. All below -ground high voltage cables within a utility right-of-way shall be made known <br />to the public through the use of signs posted therein; <br />Note: There are no proposed below -ground high voltage cables within a utility <br />right-of-way. Therefore, the above referenced signage criteria do not apply <br />to the subject project. It should be noted that "high voltage" warning signs <br />will be provide in English and Spanish along the perimeter security fence of <br />the on-site substation compound. <br />4. The disposal of all waste, gaseous, liquid or solid, shall comply with all federal, state <br />and local laws; <br />Note: It is anticipated that no hazardous or toxic waste will be generated by the <br />proposed project. The applicant has acknowledged that if there is any <br />disposal of waste, gaseous, liquid, or solid, such disposal will comply with <br />all federal, state, and local laws. <br />C-\Users\GRANIC—I\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@0006E03B\@BCL@0006E03B.docx 4 <br />P151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.