other than claims in stated amounts as may be specifically excepted by the
<br />CONTRACTOR for all things done or furnished in connection with the work
<br />under this Contract and for every act and neglect of the OWNER and others
<br />relating to or arising out of the work. Any payment, however, final or otherwise,
<br />shall not release the CONTRACTOR or its sureties from any obligations under
<br />the Contract Documents or the Public Construction Bond.
<br />ARTICLE 7 - INDEMNIFICATION
<br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and,•others in accordance with
<br />paragraph 6.20 (Indemnification) of the General Conditions°to the Construction Contract.
<br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
<br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
<br />following representations:
<br />A. CONTRACTOR has examined and carefully, studied:• the Contract Documents and the
<br />other related data identified in the Bidding Documents.
<br />B. CONTRACTOR has visited the -Site and become40miliar with, and -is satisfied as to the
<br />general, local, and Site condtions�that may'affect`post, progress; and performance of the
<br />Work.
<br />C. CONTRACTOR is familiar with and is satisfied as to•.all federal, state, and local Laws and
<br />Regulations that may,affectcost, progress, and performance of the Work.
<br />D. CONTRACTOR has carefully • studied, _ all: (1) reports of explorations and tests of
<br />subsurface• conditions at or contiguous to the Site and all drawings of physical conditions
<br />in or relating.`fo existing surface or subsurface structures at or contiguous to the Site
<br />(except Underground; Facilities) which have been identified in the Supplementary
<br />Conditions as provided in paragraph; 4.02 of the General Conditions and (2) reports and
<br />drawings of a Hazardous ;Environmental Condition, if any, at the Site which have been
<br />;identified in the Supplementary Conditions as provided in paragraph 4.06 of the General
<br />Conditions.
<br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
<br />done so) all additional or supplementary examinations, investigations, explorations, tests,
<br />studies, and data,conceming conditions (surface, subsurface, and Underground Facilities)
<br />at or contiguous 10 the Site which may affect cost, progress, or performance of the Work
<br />or which relate to any aspect of the means, methods, techniques, sequences, and
<br />procedures of construction to be employed by CONTRACTOR, including applying the
<br />specific means, methods, techniques, sequences, and procedures of construction, if any,
<br />expressly required by the Contract Documents to be employed by CONTRACTOR, and
<br />safety precautions and programs incident thereto
<br />F. CONTRACTOR does not consider that any further examinations, investigations,
<br />explorations, tests, studies, or data are necessary for the performance of the Work at the
<br />Contract Price, within the Contract Times, and in accordance with the other terms and
<br />conditions of the Contract Documents.
<br />00520 - Agreement (Public Works) REV 06-14