Consultant will prepare 60% and 100% final design of a booster pump station for review by <br />IRCU. <br />Consultant will prepare technical specifications for the site, piping, transfer pump station, <br />landscaping and pond. Consultant will prepare 60% and 100% review sets for Owner review. <br />Consultant will provide four (4) printed hard copies of each and electronic version in Adobe.pdf, <br />MSWord, and AUTOCadd 2014 format of final documents. <br />Consultant will prepare an opinion of probable construction costs for the pump station, <br />consisting of the booster pump station, influent piping and control valve station to the storage <br />tanks, pump station (pumps, piping, valves, electrical, civil, controls), distribution piping tie-in to <br />existing watermain, electrical and controls including local and distributed control via the IRCU <br />SCADA system. <br />Consultant will prepare an opinion of probable construction costs based on final drawings and <br />specifications. <br />Task 3 — ELECTRICAL DESIGN <br />Consultant's subconsultant, C&W Engineering Consultants. (C&W), will prepare electrical and <br />instrumentation engineering design associated with the booster pump station. The system is <br />assumed to be designed based on the following: <br />• Electrical improvements including motor starters in existing master pump station <br />electrical room, PLC and control panel modifications <br />• Two (2) 60 hp, or three (3) 40/50 HP booster pumps, rated for 480V 3-phase power, <br />driven by VFD's <br />• Inlet control valve with flow meters and inlet/outlet pressure monitors <br />• Level monitoring in tank <br />• A new remote PLC within the MCP shall be utilized for control and operation of the new <br />pumps and instruments <br />Consultant will visit the site and observe existing electrical service and space for new electrical <br />gear and control cabinets. C&W shall assist with building department permitting process and <br />answer a reasonable number of questions resulting from building department review. <br />Consultant will prepare electrical design drawings consisting of electrical site plan, single line <br />diagrams, control panel schematics, and details for a new booster pump station being powered <br />and controlled via VFD's and PLC control system. <br />Task 4 — PERMITTING <br />The Consultant will prepare and submit an FDEP permit application 62-555.900(1) for the <br />proposed pump station, generator, and electrical improvements, including a permit application <br />P41 <br />