Laserfiche WebLink
existing span-wire intersection, rerouting of fiber optic cabling, and complete replacement of the detection <br /> with new loops. <br /> Engineer of Record Hibiscus Boulevard and at Stewart Drive, Melbourne, FL: Mr. Ramirez designed, <br /> permitted, and bid a modification to the signalization at the intersection of Hickory Street at Hibiscus <br /> Boulevard in Melbourne, FL. The project consisted of a mast-arm replacement of an existing span-wire <br /> intersection and complete replacement of the detection with new loops. <br /> Professional Intelligent Transportation Systems(ITS)and Lighting Experience <br /> ITS & Lighting Design Engineer, 1-95 at J.T. Butler Interchange Improvement, Jacksonville, FL: Mr. <br /> Ramirez was the EOR for the IMR update, ITS and lighting component plans for an interchange <br /> improvement project in Jacksonville, FL. The design-build project was let by FDOT District 2,and consisted <br /> of an IMR update reflecting modified ramp geometry as part of an ATC;relocation or replacement of all ITS <br /> devices, power, and fiber optic cabling; and the replacement or installation of new lighting within the <br /> interchange, including maintenance girder lighting within the new overpass ramp box girders. <br /> ITS &Lighting Engineer,Widening of Homestead Ext.to the Florida Turnpike, Miami-Dade Count <br /> p � Y, <br /> FL: Mr. Ramirez was the EOR for the ITS and lighting component plans for a widening of the Florida <br /> Turnpike to accommodate express lanes along 5 miles in Miami-Dade County, FL. The design-build project <br /> was let by the Florida Turnpike Enterprise, and consisted of replacement of all ITS devices, power, and <br /> fiber optic cabling; and the replacement of impacted conventional lighting along the segment. <br /> ITS Design Engineer, Barnes Boulevard Widening, Rockledge, FL: Mr. Ramirez designed the ITS <br /> components necessary to add five traffic signals to the Brevard County ITS network as part of the Barnes <br /> Boulevard Widening project in Rockledge, FL. The project consisted of the modification of FDOT network <br /> infrastructure along SR 520, replacement of FDOT fiber optic infrastructure along Barnes Boulevard, and <br /> addition of five new intersections into the ITS. <br /> Traffic Operations Manager, Brevard County Advanced Traffic Management System Expansion <br /> (ATMS)and Wickham Intelligent Transportation System(ITS)Phase ll,Brevard County,FL: Provided <br /> support and technical assistance with the deployment, integration, validation, and final testing of an ITS <br /> expansion project which deployed CCN, travel-time,vehicle detection, and adaptive traffic signal control <br /> technologies to 112 intersections on 11 corridors in Brevard County,and interconnected them through fiber- <br /> optic cabling and Ethernet compliant network devices to two Brevard County management centers, and the <br /> City of Melbourne management center. The project included: <br /> • Underground and overhead 72 SM fiber-optic trunk cabling and 12 SM drop cabling <br /> • Juniper and ITS Express layer 2 and layer 3 networking devices <br /> • Bosch Closed Circuit Television(CCTV)Cameras <br /> • Sensys Networks wireless Vehicle Detection Systems <br /> • Sensys Networks Archive, Proxy, and Statistics(SNAPS)server <br /> • BlueTOAD Travel Time System <br /> • Naztec, Inc.Advanced Traffic Control(ATC)traffic signal controllers <br /> • Trafficware, Inc. SynchroGreen traffic adaptive server software <br /> 26 <br />