Laserfiche WebLink
i <br /> Project Management and Bid Document Preparation <br /> These team member capabilities, coupled with Mr. Flavell's 30 years road improvement and <br /> pavement maintenance design and construction experience, is one of the capabilities that sets <br /> our team apart. Another is Mr. Flavell's significant project management experience as a prime <br /> consultant project manager, managing as many as 11 subconsultants and with experience over <br /> a variety of design and construction projects that include roads,utilities,drainage,water treatment <br /> plants and wastewater treatment plants. <br /> i <br /> Specific road modification and pavement recycling projects have taught us the importance of early I <br /> utility coordination, because existing facilities will require lowering in order to perform the recycling <br /> and then adjusting to finish grade. We also need to find out about scheduled utility maintenance <br /> project so newly reconstructed roads are not cut up shortly after reconstruction. Construction <br /> projects have taught us the importants of detailed drawings and attention to the design of conform <br /> locations. It is these types of issues that our experience will anticipate and address through the <br /> course of this design. <br /> 43 <br />