My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-081
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2017 9:58:44 AM
Creation date
5/24/2017 9:58:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/23/2017
Control Number
2017-081
Agenda Item Number
8.H.
Entity Name
Bowman Consulting Group LTD
Subject
Pavement Reclamation
Resurfacing Project
Area
58th Ave.
Project Number
2016016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAINLINE PLANS S-43 1"=40' LTG <br /> MAINLINE PLANS S-44 V=40' LTG <br /> MAINLINE PLANS S-45 1"=40' LTG <br /> MAINLINE PLANS S-46 1"=40' LTG <br /> SIDE STREET PLANS—57TH STREET S-47 1"=40' LTG <br /> SIDE STREET PLANS—57TH STREET S-48 1"=40' LTG <br /> SIDE STREET PLANS—69TH STREET S-49 1"=40' LTG <br /> SIDE STREET PLANS— 69TH STREET S-50 1"=40' LTG <br /> SIDE STREET PLANS— 69TH STREET S-51 V=40' LTG <br /> SIDE STREET PLANS— 69TH STREET S-52 V=40' LTG <br /> SIDE STREET PLANS— CR510 S-53 1"=40' LTG <br /> SIDE STREET PLANS— CR510 S-56 1"=40' LTG <br /> GUIDE SIGNS SHEETS S-57 N/A LTG <br /> GUIDE SIGNS SHEETS S-58 N/A LTG <br /> GUIDE SIGNS SHEETS S-59 N/A LTG <br /> TOTAL 208 <br /> Proposed Project Schedule <br /> Description Time Total Time <br /> Preliminary Engineering <br /> Notice to Proceed <br /> Survey and To o Mapping b Count Complete <br /> Meeting (Kick-off) <br /> Utility Research 6 wks 6 wks <br /> Geotechnical Evaluation 8 wks 8 wks <br /> Layout proposed alignment and typical sections 8 wks 8 wks <br /> Identify constraints and prepare cost estimate 2 wks 10 wks <br /> Meeting review constraints and costs, refine project, in-progressplans) <br /> Agency Review of In Progress Plans 2 wks 12 wks <br /> Final Design <br /> Start Final Design <br /> Design to approximately 60% complete 12 wks 24 wks <br /> Design to approximately 90% complete 6 wks 30 wks <br /> Meet to review design, specs and costs <br /> Plan checking FDOT, County, in-house and field 5 wks 35 wks <br /> Address comments and complete deliver final bid documents 4 wks 39 wks <br /> 9 mo <br /> BCG INITIAL CLIENT INITIAL <br /> Page 13 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.