Laserfiche WebLink
Table 4 <br /> MAY 2017 BUDGET ESTIMATE <br /> SOUTH GIFFORD ROAD LANDFILL <br /> PHASE 4:Semi-Annual Sampling Activities <br /> ITEM BASIS RATE QUANTITY ESTIMATED <br /> BUDGET <br /> A Professional,Services , <br /> Senior Project Geologist hr $188 4 $752 <br /> Geologist hr $134 16 $2,144 <br /> Senior Staff Geologist hr $119 100 $11,900 <br /> Subtotal Professional Services $14,796 <br /> B..Technical/Administrative Services <br /> Field Superintendent hr $119 100 $11,900 <br /> Administrative Assistant hr $94 2 $188 <br /> Subtotal Technical/Administrative Services $12,088 <br /> O.;Subcontractors , ' <br /> Laboratory Analysis for VOCs each $59 62 $3,649 <br /> Laboratory Analysis for TOC each $27 5 $134 <br /> Laboratory Analysis for Dissolved Gases each $80 6 $482 <br /> Laboratory Analysis for UIC parameters each $163 2 $325 <br /> Laboratory Analysis for Dhc each $305 2 $610 <br /> Laboratory Analysis for vcrA each $90 2 $180 <br /> Subtotal Subcontractor Services $5,379 <br /> D. Reimbursables ".,,, , <br /> PDBs for Summer event quote $32 5 $160 <br /> PDBs for Winter event quote $32 38 $1,218 <br /> Drums each $50 2 $100 <br /> Drum Transport each $963 2 $1,926 <br /> Lodging day $134 14 $1,876 <br /> Per Diem day $59 14 $826 <br /> Communications Fee 3%labor 0.03 $26,884 $807 <br /> Field Vehicle day $80 14 $1,120 <br /> 8.5"x11"Photocopies each $0.12 160 $19 <br /> Overnight Cooler each $95 4 $380 <br /> Groundwater Sampling Kit(per sampler) day $300 8 $2,400 <br /> Water Level Measurement Kit(2 person team', day $55 2 $110 <br /> PDB Deployment Kit day $100 2 $200 <br /> Equipment Shipping each $54 3 $162 <br /> Subtotal Reimbursables $11,304 <br /> .TOTAL ESTIMATED.BUDGET:PHASE 4 ' $43,567 <br /> Notes: <br /> 1. Lodging and per diem rates were taken from the GSA website for the Vero Beach area(www.gsa.gov). <br /> 2. Groundwater Sampling Kit includes two sets of the following:water level indicator,peristaltic pump,water quality meter(pH, <br /> temperature,conductivity,dissolved oxygen,and oxidation reduction potential),turbidity meter, tubing,and miscellaneous field supplies <br /> 3.Water Level Measurement Kit includes:water level indicator and miscellaneous field supplies. <br /> 4.PDB Deployment Kit includes:miscellaneous field supplies necessary to suspend and deploy PDBs. <br /> 5.UIC parameters include total recoverable petroleum hydrocarbons,polysorbate 80 surfactant,sodium,chloride,and total dissolved solids <br /> PR17015 Geosyntec Consultants <br />