Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. Geosyntec <br /> 5 May 2017 consultants <br /> Page 4 <br /> monitoring well, including existing monitoring wells and applicable City of Vero Beach wells <br /> (assumed up to 88 wells per event). <br /> It is anticipated that purge water(investigation-derived waste [IDW]) will be containerized in 55- <br /> gallon polyethylene drums and temporarily staged on Site for characterization prior to removal <br /> and disposal. Costs are included herein for two 55-gallon polyethylene drums and oversight of <br /> drum disposal concurrent with one of the sampling events. <br /> Overall, budget has been included for seven field days with a two-person team (i.e., 14 man days) <br /> and associated field expenses for sampling, plus four hours for IDW management. <br /> Task 6—Data Evaluation and Semi-Annual Reporting: Under this task,Geosyntec will perform <br /> data evaluation activities and reporting. The reporting includes preparation of one semi-annual <br /> report (simplified format) and one annual report for submittal to FDEP. <br /> The annual report will be consistent with the groundwater monitoring reports historically <br /> submitted to FDEP for this Site and the data evaluation activities will include database <br /> management, screening results against applicable regulatory criteria, GIS figure preparation, time <br /> trend analyses, and/or statistical data analyses. This report will be prepared following the summer <br /> groundwater sampling event. The annual report will be supported by attachments containing <br /> Chain-of-Custody sheets, field notes and observations, water sampling logs, maps, graphs, <br /> analytical results, and any other applicable materials. <br /> The semi-annual report will be a letter report with attachments, including a monitoring well <br /> location map and tables of the field and laboratory results. Data evaluation activities for the semi- <br /> annual report will include database management, screening results against applicable regulatory <br /> criteria, and summary data table preparation. This report will be prepared following the fall/winter <br /> groundwater sampling event. <br /> The draft annual and semi-annual reports will be submitted to IRC SWDD for review prior to <br /> submittal to FDEP.Each final report will be signed and sealed by a Florida registered professional <br /> engineer or geologist. <br /> SCHEDULE <br /> Geosyntec will conduct the groundwater monitoring and reporting activities on a semi-annual basis <br /> as described herein. The semi-annual groundwater monitoring events will be tentatively conducted <br /> in June and December 2017. <br /> XR 17051\PR 17015 <br /> engineers I scientists I innovators <br />