My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-079
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2017 10:29:22 AM
Creation date
5/30/2017 4:37:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/16/2017
Control Number
2017-079
Agenda Item Number
15.B.4.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 6 Amended from Work Order No. 5
Area
Gifford Landfill
Document Relationships
2017-124
(Cover Page)
Path:
\Official Documents\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. Geosyntec <br /> 5 May 2017 consultants <br /> Page 4 <br /> monitoring well, including existing monitoring wells and applicable City of Vero Beach wells <br /> (assumed up to 88 wells per event). <br /> It is anticipated that purge water(investigation-derived waste [IDW]) will be containerized in 55- <br /> gallon polyethylene drums and temporarily staged on Site for characterization prior to removal <br /> and disposal. Costs are included herein for two 55-gallon polyethylene drums and oversight of <br /> drum disposal concurrent with one of the sampling events. <br /> Overall, budget has been included for seven field days with a two-person team (i.e., 14 man days) <br /> and associated field expenses for sampling, plus four hours for IDW management. <br /> Task 6—Data Evaluation and Semi-Annual Reporting: Under this task,Geosyntec will perform <br /> data evaluation activities and reporting. The reporting includes preparation of one semi-annual <br /> report (simplified format) and one annual report for submittal to FDEP. <br /> The annual report will be consistent with the groundwater monitoring reports historically <br /> submitted to FDEP for this Site and the data evaluation activities will include database <br /> management, screening results against applicable regulatory criteria, GIS figure preparation, time <br /> trend analyses, and/or statistical data analyses. This report will be prepared following the summer <br /> groundwater sampling event. The annual report will be supported by attachments containing <br /> Chain-of-Custody sheets, field notes and observations, water sampling logs, maps, graphs, <br /> analytical results, and any other applicable materials. <br /> The semi-annual report will be a letter report with attachments, including a monitoring well <br /> location map and tables of the field and laboratory results. Data evaluation activities for the semi- <br /> annual report will include database management, screening results against applicable regulatory <br /> criteria, and summary data table preparation. This report will be prepared following the fall/winter <br /> groundwater sampling event. <br /> The draft annual and semi-annual reports will be submitted to IRC SWDD for review prior to <br /> submittal to FDEP.Each final report will be signed and sealed by a Florida registered professional <br /> engineer or geologist. <br /> SCHEDULE <br /> Geosyntec will conduct the groundwater monitoring and reporting activities on a semi-annual basis <br /> as described herein. The semi-annual groundwater monitoring events will be tentatively conducted <br /> in June and December 2017. <br /> XR 17051\PR 17015 <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.