My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-074F
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-074F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2017 4:06:42 PM
Creation date
6/2/2017 12:11:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/16/2017
Control Number
2017-074F
Agenda Item Number
12.G.1.
Entity Name
Timothy Rose Contracting
IRCDUS
Subject
North County Commercial Sewer & Water
Area
North County
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
restricted to a single lane. <br /> ARTICLE 2 ENGINEER <br /> The North County Commercial Sewer & Water project has been designed by Masteller & Moler, <br /> Inc., hereinafter called ENGINEER, and who is to act as OWNER'S representative, assume all <br /> duties and responsibilities and have the rights and authority assigned to ENGINEER in the <br /> Contract Documents in connection with completion of the work in accordance with the Contract <br /> Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3.1 The CONTRACTOR shall be substantially completed with the following timeframe: <br /> (a) Within 30 calendar days from effective date of Notice to Proceed, Contractor shall <br /> complete the following tasks: <br /> 1. Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to <br /> be utilized on the job. <br /> 3. Perform all photographic recording and documentation of <br /> conditions prior to construction. <br /> 4. Locate all existing utilities in the area of work. <br /> 5. Submit and secure approval of shop drawings. <br /> 6. Mobilize all labor, equipment, and materials. <br /> 7. Deliver and store all equipment and materials to the job site. <br /> 8. Notify all utilities and other affected parties prior to initiating <br /> construction. <br /> (b) From 31 calendar days to 270 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Install all pipe and appurtenant items. <br /> 2. Perform all testing. <br /> 3. Restore all disturbed areas to their pre-construction condition. <br /> 4. Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br /> Substantial Completion. <br /> (c) From 271 calendar days to 330 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Clean up project area. <br /> 2. Remove all equipment and material from project site. <br /> 3. Perform contract closeout procedures. <br /> 3.2 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br /> Completion. <br /> 3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence <br /> of this Agreement and that OWNER will suffer financial loss if the work is not completed <br /> 00530-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.