My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-083
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 12:03:22 PM
Creation date
6/7/2017 12:02:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
06/06/2017
Control Number
2017-083
Agenda Item Number
8.G.
Entity Name
Blue Goose Construction
Subject
Pelican Pointe Water Service Lateral Replacement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 2017-006 <br />Pelican Pointe Water Service Lateral Replacement <br />BLUE GOOSE CONSTRUCTION <br />ATTACHMENT 2 <br />DATE OF ISSUANCE: May 24, 2017 EFFECTIVE DATE: June 6, 2017 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014 <br />PROJECT: Pelican Pointe Water Service Lateral Replacement <br />COUNTY UTILITY PROJECT NO.: UCP #N/A <br />COUNTY WIP. No. 471-169000-17519 <br />You are directed to proceed promptly with the following work: <br />CONTRACTOR'S PROJECT NO.: N/A <br />Description: Construct new water service laterals between existing water main and meter boxes. <br />Attachments: Attachment 1 <br />Method of determining Contract Price: <br />Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />Lump Sum <br />Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost (rounded) _ <br />$70,809.75 <br />Estimated <br />90 days from NTP <br />Contract Time: <br />--7 <br />ACCEpJEP% <br />r J <br />Blue Goose Construction <br />Labor Contractor <br />Date: 641 <br />e <br />ATTEST: <br />RECOM LADED: <br />- By: <br />l John M. Boyer, P.E. <br />Utilities Engineer <br />Date: 5/ ff <br />FOR, ; J.R. SMIT CL ' K <br />APPROVED AS TO FORM <br />AND LEGAL SUFFICIENCY <br />BY <br />DYLAN REINGOLD <br />COUNTY ATTORNEY <br />I'. l'uliues l;"f (ID 1' - Humeerin Puyects l'hlit\' (un,tntcrun Permits IRC - Pelican Pointe \\ S Raplac.0 ent-4 134 •\clm a .\genda <br />Item \Cock •\ut{tori/at ton No 201 7-U(1,.dt+c <br />
The URL can be used to link to this page
Your browser does not support the video tag.