Laserfiche WebLink
UCC. 1 611050 c'. <br />IRCU WELL 47 SOUTH COUNTY R/0 PLANT <br />6692595 <br />600 20TH AVE SW <br /># OF UNITS <br />(13 2.12 a) Primary lateral riser) if from overhead lerminahon point), pad mounted transformer and trench wdh cable -in Conduit <br />not to exceed 150 feet for radials and 300 feet for loops. <br />Si 501,), 1. 3.1 ,I <br />I'7 2 (2.6 I We Ph a'0 r a S,1 <br />I2„ '; Thi, • PIO , Radial 1 ;3412„ <br />', 1 2 1 2 0 .11 Titre l Pha le n" 0111 2211, <br />II- 2 loo 5i sing, Phase bloc <br />(L.'- 123 61 Two Phre Loop <br />,17217 a '1 Three Ph, .'i.onp-,51,(1211 <br />(1321207) Three.^naa-Loop '.301'/6 <br />From Overhead Termination Point <br />(13.2.12.b) Secondary riser and lateral, excluding handhole or junction box, with connection to Applicant's service cables <br />no greater than 20 feet front Company riser pole. <br />I' ' 12 i; 11 Shall :,Inglt Phase 4,0 1P, ,i, 11 ,11:, <br />(1' 2 12 6 2) Large Sm91. Phase 1,3,101n .lit, TP' <br />(13 2 12 b 31 511,311 Three Phase 4,3 2100 o snnll •r <br />(1) 7 1 / ; 4, Large Throe Phas•. 2,g:•, than 4'0 <br />125, X <br />41 592 X <br />5801 30 X <br />5I 036 41 x <br />(13 2.12.c) Small UG commercial services (60 Amp 120V 1125 Amp 1201240V per SPO 21010.4) <br />113 2 12 c 1 a) 2 wife 11200) eel "1' c„ ...200.i0le 35,.02 <br />212 1 10 3 WIIQ!120,210V1 "' ,i,, 0, 11,01 <br />'11212071)2 wet (-20V)se ,'. ca ,nacce,s,n,, we an 11012 <br />/2212-2 61 2 woe (120/2101(0 .511,1-'.'..411,10 ., , <br />2121ra(•7373/)c_,'0. ,,1.a, Ir,.r, :lel.1101 <br />,322, •(1 1 w'e )1311,210;,.r,,. coa ncs,,10 co, . <br />217 7.3 <br />X <br />1.1 <br />t'1. <br />5143 2^ X <br />A <br />3' Sb <br />111171, t <br />(13.2.12.d) Handholes and Padmounted Secondary Junction Boxes, excluding connections. <br />(1' 2 17 d 11 Harmonic, <br />113 2 12 d 1 a) Sma',I 24 hardhole <br />(13 2 12 d 1 b) In,ermed,r0 30" h.," nn,,,' <br />(11 2 12 d 1 6) Large. 48" handhao <br />(11 2 12 d 2, Pad Mounted Junction Box (P4,1 T1 Lo.n'r* <br />Cabinet M&S 8161 40000-7) <br />111 2 12.d 3 al Pad Mounted Junction Ca2rret (14 Van <br />3 phase cabinet M&S 8161 40100 3) <br />(17 2 12 d 3 b) 1 arming conductors of more than 12 eels, <br />(13.2.12.0) Primary Splice Box including splices and cable pulling set-up <br />(13 2 12 e 1) Sing!, Phase per bo. <br />(132.12 e 2) Two Phase per box <br />71)2121311210,0, Phase per bo, <br />1/..) 11 <br />524, 53 X <br />1317 33 X <br />52`.,72a X <br />1100"1213 X <br />53.120 X <br />51 3.16 64 X <br />51,85916 X <br />52,072 15 X <br />1161 r',:, <br />per .1010 <br />1111151 <br />?HH <br />r HH <br />per 6G <br />6061211 <br />per bo, <br />per ho, <br />per he <br />LT' 2/2112017 <br />Exhibit "A" Exhibit "8" <br />1 1 <br />OF UNITS I CHARGES <br />From Existing Underground <br />Termination Point <br />,3 X <br />,/ X <br />X <br />.,14•) X <br />o.) X <br />50 00 X <br />0'3 X 0,/ <br />0,),1 X q1" <br />(13.2.12.1) Additional installation charge for underground primary laterals including trench and cabtean'conduit which exceeds <br />the limits set in 13.2.12 a to reach FPL designated point of delivery. <br />'-- 2 12 1 1) 5,11916 Phase pe, foo' <br />(1' 2 12 f 21 Two Phase per fon' <br />(1'3 2 12 f 3) Three Phase per 100) <br />30 71 <br />52 72 x <br />$233 <br />tt <br />per ft <br />(13.2.12.9) Additional installation charge for underground primary laterals Including trench and cable -in -conduit extended <br />beyond the FPL designated point of delivery. <br />(13 2 12 9 1/Single Phase per foot <br />(13 2 12 g 2) Two Phase per foot <br />(13 2 12 9 3) Three Phase per loot <br />(13.2.12.6) UG Feeder <br />(13 2 12 h) 1000 KCMIL (not including switch package, <br />(13.2 12 h) Switch package I6/6 or 9/3 per package) <br />/13 2 12 h) Switch package (414 per package) <br />(13.2.13.a) Trench and backfilling credits <br />(13 2 13 a 1) Credit per foot of primary tre:ah <br />(13 2 13 a 2) Credit per font of secondary trench <br />(13.2.13.b) Conduit installation credits <br />(13 2 13 b 1) Credit per foot of 2" PVC <br />2 13 b 2) Credit per foot of >2' PVC <br />(13.2.13.c) Handhole 1 primary splice box installation credits <br />(1321;01) Credit per large HH 1greate1 than 30' )IPo SpI: Bar <br />(11 2 13 c 2) Credit per small / Intermediate HI -1110 or less) <br />(13.2.13.d) Transformer I cap bank pad installation credits <br />1 13 2 13 d I Credit per pad <br />5e74 r. <br />51303 X <br />51520 X <br />53 02 X <br />527 20043 X <br />52:.20443 X <br />5340 <br />53 76 <br />'.227 <br />461 19 <br />Bader Splice Box Cleo. <br />Padm.oan. 6 0110h0;161-5rCr-,In )525 15 <br />Additional Charges (e.g. non -rapid trenching, restoration, etc.) <br />2124,2011 9 10 40 <br />per n <br />per ft <br />per ft <br />pet ft <br />each <br />each <br />per ft <br />per) <br />.1411;• <br />rl'', <br />qts <br />T./ <br />nh3 <br />DIFFERENTIAL COST FOR BORING 20TH AVE SW <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />03.667,00 I <br />TOTAL CONTRIBUTION: ( $ 3,667,00 <br />LE>3 rut 41 (7,416101111, <br />TOTAL CASH PAYMENT' $ 3,667.00 <br />TOTAL CUSTOMER PAYMENT <br />(CONTRIBUTION MAT 0 LABOR) <br />(CONTRIBUTION CASH) <br />$ 3,667.00 <br />- <br />$ 3,667.00 <br />