UCC. 1 611050 c'.
<br />IRCU WELL 47 SOUTH COUNTY R/0 PLANT
<br />6692595
<br />600 20TH AVE SW
<br /># OF UNITS
<br />(13 2.12 a) Primary lateral riser) if from overhead lerminahon point), pad mounted transformer and trench wdh cable -in Conduit
<br />not to exceed 150 feet for radials and 300 feet for loops.
<br />Si 501,), 1. 3.1 ,I
<br />I'7 2 (2.6 I We Ph a'0 r a S,1
<br />I2„ '; Thi, • PIO , Radial 1 ;3412„
<br />', 1 2 1 2 0 .11 Titre l Pha le n" 0111 2211,
<br />II- 2 loo 5i sing, Phase bloc
<br />(L.'- 123 61 Two Phre Loop
<br />,17217 a '1 Three Ph, .'i.onp-,51,(1211
<br />(1321207) Three.^naa-Loop '.301'/6
<br />From Overhead Termination Point
<br />(13.2.12.b) Secondary riser and lateral, excluding handhole or junction box, with connection to Applicant's service cables
<br />no greater than 20 feet front Company riser pole.
<br />I' ' 12 i; 11 Shall :,Inglt Phase 4,0 1P, ,i, 11 ,11:,
<br />(1' 2 12 6 2) Large Sm91. Phase 1,3,101n .lit, TP'
<br />(13 2 12 b 31 511,311 Three Phase 4,3 2100 o snnll •r
<br />(1) 7 1 / ; 4, Large Throe Phas•. 2,g:•, than 4'0
<br />125, X
<br />41 592 X
<br />5801 30 X
<br />5I 036 41 x
<br />(13 2.12.c) Small UG commercial services (60 Amp 120V 1125 Amp 1201240V per SPO 21010.4)
<br />113 2 12 c 1 a) 2 wife 11200) eel "1' c„ ...200.i0le 35,.02
<br />212 1 10 3 WIIQ!120,210V1 "' ,i,, 0, 11,01
<br />'11212071)2 wet (-20V)se ,'. ca ,nacce,s,n,, we an 11012
<br />/2212-2 61 2 woe (120/2101(0 .511,1-'.'..411,10 ., ,
<br />2121ra(•7373/)c_,'0. ,,1.a, Ir,.r, :lel.1101
<br />,322, •(1 1 w'e )1311,210;,.r,,. coa ncs,,10 co, .
<br />217 7.3
<br />X
<br />1.1
<br />t'1.
<br />5143 2^ X
<br />A
<br />3' Sb
<br />111171, t
<br />(13.2.12.d) Handholes and Padmounted Secondary Junction Boxes, excluding connections.
<br />(1' 2 17 d 11 Harmonic,
<br />113 2 12 d 1 a) Sma',I 24 hardhole
<br />(13 2 12 d 1 b) In,ermed,r0 30" h.," nn,,,'
<br />(11 2 12 d 1 6) Large. 48" handhao
<br />(11 2 12 d 2, Pad Mounted Junction Box (P4,1 T1 Lo.n'r*
<br />Cabinet M&S 8161 40000-7)
<br />111 2 12.d 3 al Pad Mounted Junction Ca2rret (14 Van
<br />3 phase cabinet M&S 8161 40100 3)
<br />(17 2 12 d 3 b) 1 arming conductors of more than 12 eels,
<br />(13.2.12.0) Primary Splice Box including splices and cable pulling set-up
<br />(13 2 12 e 1) Sing!, Phase per bo.
<br />(132.12 e 2) Two Phase per box
<br />71)2121311210,0, Phase per bo,
<br />1/..) 11
<br />524, 53 X
<br />1317 33 X
<br />52`.,72a X
<br />1100"1213 X
<br />53.120 X
<br />51 3.16 64 X
<br />51,85916 X
<br />52,072 15 X
<br />1161 r',:,
<br />per .1010
<br />1111151
<br />?HH
<br />r HH
<br />per 6G
<br />6061211
<br />per bo,
<br />per ho,
<br />per he
<br />LT' 2/2112017
<br />Exhibit "A" Exhibit "8"
<br />1 1
<br />OF UNITS I CHARGES
<br />From Existing Underground
<br />Termination Point
<br />,3 X
<br />,/ X
<br />X
<br />.,14•) X
<br />o.) X
<br />50 00 X
<br />0'3 X 0,/
<br />0,),1 X q1"
<br />(13.2.12.1) Additional installation charge for underground primary laterals including trench and cabtean'conduit which exceeds
<br />the limits set in 13.2.12 a to reach FPL designated point of delivery.
<br />'-- 2 12 1 1) 5,11916 Phase pe, foo'
<br />(1' 2 12 f 21 Two Phase per fon'
<br />(1'3 2 12 f 3) Three Phase per 100)
<br />30 71
<br />52 72 x
<br />$233
<br />tt
<br />per ft
<br />(13.2.12.9) Additional installation charge for underground primary laterals Including trench and cable -in -conduit extended
<br />beyond the FPL designated point of delivery.
<br />(13 2 12 9 1/Single Phase per foot
<br />(13 2 12 g 2) Two Phase per foot
<br />(13 2 12 9 3) Three Phase per loot
<br />(13.2.12.6) UG Feeder
<br />(13 2 12 h) 1000 KCMIL (not including switch package,
<br />(13.2 12 h) Switch package I6/6 or 9/3 per package)
<br />/13 2 12 h) Switch package (414 per package)
<br />(13.2.13.a) Trench and backfilling credits
<br />(13 2 13 a 1) Credit per foot of primary tre:ah
<br />(13 2 13 a 2) Credit per font of secondary trench
<br />(13.2.13.b) Conduit installation credits
<br />(13 2 13 b 1) Credit per foot of 2" PVC
<br />2 13 b 2) Credit per foot of >2' PVC
<br />(13.2.13.c) Handhole 1 primary splice box installation credits
<br />(1321;01) Credit per large HH 1greate1 than 30' )IPo SpI: Bar
<br />(11 2 13 c 2) Credit per small / Intermediate HI -1110 or less)
<br />(13.2.13.d) Transformer I cap bank pad installation credits
<br />1 13 2 13 d I Credit per pad
<br />5e74 r.
<br />51303 X
<br />51520 X
<br />53 02 X
<br />527 20043 X
<br />52:.20443 X
<br />5340
<br />53 76
<br />'.227
<br />461 19
<br />Bader Splice Box Cleo.
<br />Padm.oan. 6 0110h0;161-5rCr-,In )525 15
<br />Additional Charges (e.g. non -rapid trenching, restoration, etc.)
<br />2124,2011 9 10 40
<br />per n
<br />per ft
<br />per ft
<br />pet ft
<br />each
<br />each
<br />per ft
<br />per)
<br />.1411;•
<br />rl'',
<br />qts
<br />T./
<br />nh3
<br />DIFFERENTIAL COST FOR BORING 20TH AVE SW
<br />$
<br />$
<br />$
<br />$
<br />$
<br />$
<br />$
<br />$
<br />$
<br />$
<br />03.667,00 I
<br />TOTAL CONTRIBUTION: ( $ 3,667,00
<br />LE>3 rut 41 (7,416101111,
<br />TOTAL CASH PAYMENT' $ 3,667.00
<br />TOTAL CUSTOMER PAYMENT
<br />(CONTRIBUTION MAT 0 LABOR)
<br />(CONTRIBUTION CASH)
<br />$ 3,667.00
<br />-
<br />$ 3,667.00
<br />
|