My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-059C
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-059C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2017 10:37:09 AM
Creation date
6/8/2017 10:31:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/02/2017
Control Number
2017-059C
Agenda Item Number
8.J.
Entity Name
Advanced Roofing Inc.
Subject
Roof Replacement Project for Administration Building
Project Number
1705
Bid Number
2017040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County. <br />CONTRACTOR - <br />CONTRACT FOR:INDIAN RIVER COUNTY ADMINISTRATION COMPLEX BUILDINGS A & B <br />ROOF REPLACEMENT <br />Project No.: 1705 <br />Project Description: The Project involves the removal and disposal of the existing tile roof <br />system including flashing, sheet metal, and underlayment down to the existing nailable <br />wood substrate for inspection; remove any moisture contaminated, deteriorated, or <br />damaged nailable substrate and insulation as directed by Owner/Architect; and repair <br />any rusted steel deck before installing new replacement materials; mechanically fasten <br />standing seam metal roof panel clips through the insulation system into the structural <br />steel deck and install new standing seam metal roof system; provide new sheet metal <br />flashing and accessories to provide a complete, watertight, 20 -year warrantable roof <br />assembly. <br />OWNER's Bid No. 2017040 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To - <br />OWNER <br />And T <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07.doc <br />00630-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1705 Buildings A& B Roof Replacement\1-Admin\Bid Documents\Master Contract Documents\00630 -Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.