Laserfiche WebLink
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County. <br />CONTRACTOR - <br />CONTRACT FOR:INDIAN RIVER COUNTY ADMINISTRATION COMPLEX BUILDINGS A & B <br />ROOF REPLACEMENT <br />Project No.: 1705 <br />Project Description: The Project involves the removal and disposal of the existing tile roof <br />system including flashing, sheet metal, and underlayment down to the existing nailable <br />wood substrate for inspection; remove any moisture contaminated, deteriorated, or <br />damaged nailable substrate and insulation as directed by Owner/Architect; and repair <br />any rusted steel deck before installing new replacement materials; mechanically fasten <br />standing seam metal roof panel clips through the insulation system into the structural <br />steel deck and install new standing seam metal roof system; provide new sheet metal <br />flashing and accessories to provide a complete, watertight, 20 -year warrantable roof <br />assembly. <br />OWNER's Bid No. 2017040 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To - <br />OWNER <br />And T <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07.doc <br />00630-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1705 Buildings A& B Roof Replacement\1-Admin\Bid Documents\Master Contract Documents\00630 -Certificate of <br />Substantial Completion REV 04-07.doc <br />