My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-059C
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-059C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2017 10:37:09 AM
Creation date
6/8/2017 10:31:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/02/2017
Control Number
2017-059C
Agenda Item Number
8.J.
Entity Name
Advanced Roofing Inc.
Subject
Roof Replacement Project for Administration Building
Project Number
1705
Bid Number
2017040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEMIZED BID SCHEDULE <br />PROJECT NAME: INDIAN RIVER COUNTY ADMINISTRATION COMPLEX <br />BUILDINGS A & B ROOF REPLACEMENT <br />IRC PROJECT NO. 1705 BID NO. 2017040 <br />BIDDER'S NAME: Advanced Roofing, Inc. <br />Item No. <br />Descri tion <br />Unit <br />Quantity <br />Unit Price <br />`Amount <br />BUILDING "A" INSTALL NEW STANDING SEAM ROOF SYSTEM - PROVIDED <br />001 <br />PER PLANS SET <br />LS <br />1 <br />$662,855.00 <br />$662,855.00 <br />BUILDING "A" REPLACE EXISTING NAILBASE INSULATION BOARDS WITH <br />231 Q�b SS <br />A MINIMUM TWO LAYERS OF 1.8" POLYISO INSULATION BOARDS <br />002 <br />(MINIMUM R-20) <br />SF <br />53,213 <br />$4.35 <br />$231,475.00 <br />003 <br />BUILDING "A" REPAIR DAMAGED AND RUSTED STEEL DECKING (16 GA) <br />SF <br />2,000 <br />$12.50 <br />$25,000.00 <br />BUILDING "B" INSTALL NEW STANDING SEAM ROOF SYSTEM - PROVIDED <br />.004 <br />PER PLANS SET <br />LS <br />1 <br />$581,670.00 <br />$581,670.00 <br />BUILDING "B" REPLACE EXISTING NAILBASE INSULATION BOARDS WITH <br />2� J <br />A MINIMUM TWO LAYERS OF 1.8" POLYISO INSULATION BOARDS <br />005 <br />(MINIMUM R-20) <br />SF <br />46,131 <br />$4.35 <br />$200,670.00 <br />006 <br />BUILDING "B" REPAIR DAMAGED AND RUSTED STEEL DECKING (16 GA) <br />SF <br />1 2,000 <br />$12.50 <br />1$25,000.00 <br />007 <br />REPLACE DAMAGED OR DETERIORATED WOOD BLOCKING <br />BF <br />1,500 <br />$2.00 <br />$3,000.00 <br />FORCE ACCOUNT <br />100,000.00 <br />TOTAL BID AMOUNT (INCLUDING FORCE ACCOUNT) TOTAL <br />$1,829,670.00 <br />l r uta,(,,1 I.4o <br />TOTAL PROJECT BID AMOUNT IN WORDS One Million Eight Hundred Twenty Nine Thousand Six Hundred Seventy Dollars <br />NOTE: IF THERE IS A DISCREPENCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) AND THE ITEMIZED BID SCHEDULE, THE BID DOCUMENTS WILL GOVERN. <br />LS = LUMP SUM SF = SQUARE FEET' BF = BOARD FEET <br />00310-3 <br />F.1Public WorksNENGINEERING DIVISION PROJECTS%1705 Buildings A 6 B Roof Replacement\1-Admin0ld DocumentsWlasler Contract DocumentsUtemhed Bid Schedule IRC No 1705As <br />
The URL can be used to link to this page
Your browser does not support the video tag.