My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/02/2017
CBCC
>
Meetings
>
2010's
>
2017
>
05/02/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:32:50 PM
Creation date
6/12/2017 11:36:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/02/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br />0 <br />t <br />b. Joints: Rubber and steel joint for prestressed <br />pipe in accordance with current Lock Joint Pipe <br />Company Specification on SPS, or equivalent. <br />Joints for bell and spigot and tongue and groove <br />pipe to be in accordance with current standard <br />practice. Joints may be made using confined <br />continuous rubber gasket. <br />2. Cast Iron Pipe <br />a. Materials: Pipe must conform to current ASTM <br />specification A142 for "Standard Pipe." <br />b. Joints: Bell and spigot, caulked with lead and <br />oakum, or and approved mechanical type. <br />3. Polyethylene Pipe <br />a. Materials: Pipe must conform to current ASTM <br />Specifications 02104, Schedule 40, for standard <br />pipe. <br />4. Steel Pipe <br />a. Materials: Pipe must conform to current ASTM <br />Specification A120, Schedule 40. <br />'b. Joints: All joints must be welded or of an <br />approved mechanical type. <br />F. Carrier pipe with and internal pressure less that 30 psi <br />shall have the ends of the casing pipe sealed after <br />installation. <br />G. Carrier pipe with and internal pressure of 30 psi and over <br />shall have the casing pipe open at the ends if local <br />conditions permit water from leaks to discharge into <br />drainage ditch of manhole. If this is not practicable, the <br />casing pipe shall be sealed at both ends and 4 inch relief <br />vent provided at either and off the Railway's right of way, <br />which shall -discharge into drainage ditch or sewer. <br />H. Uncased high pressure gas pipe line crossings will be <br />permitted provided they comply with the requirements of <br />Chapter one, part 5.2, specifications for Uncased Gas <br />Pipe Line within the Railway Right of Way (1993), as is <br />contained in the "Manual for Railway Engineers", issued by <br />the American Railway Engineers Association". In the event of <br />conflict the provisions of the "General Specifications for <br />Subgrade and Above Grade Crossings of Railway's Right of <br />Way" shall supersede. <br />ME <br />
The URL can be used to link to this page
Your browser does not support the video tag.