Laserfiche WebLink
be governed by the applicable grant requirements and guidelines. 6.05 Acceptance of Final <br />Payment as Release. <br />A. The acceptance by the CONTRACTOR of final payment shall be and shall operate <br />as a release to the OWNER from all claims and all liability to the CONTRACTOR <br />other than claims in stated amounts as may be specifically excepted by the <br />CONTRACTOR for all things done or furnished in connection with the work <br />under this Contract and for every act and neglect of the OWNER and others <br />relating to or arising out of the work. Any payment, however, final or otherwise, <br />shall not release the CONTRACTOR or its sureties from any obligations under <br />the Contract Documents or the Public Construction Bond. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENI <br />paragraph 6.20 (Indemnification) of the General` <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATI0 <br />8.01 In order to induce OWNER to enter i 1S.this Ag <br />following representations: Al"EN% <br />A. CONTRACTOR has examined:, <br />other related data identified in th <br />B. CONTRACTOR h4lgg ted the <br />general, local, andf�co'f'#iti <br />Work. <br />(NEER, and 16'Oft in accordance with <br />bnditions to the %nstruction,Contract. <br />f. TRAC4RbR makes the <br />'�rnent C�O \ _ � 44 <br />IMM <br />Ydied the Contract Documents and the <br />f 5hpliar with and is satisfied as to the <br />cost, progress, and performance of the <br />C. CONTRACTMI :s familiar v�ffi' and is"s'���'�fied as to all federal, state, and local Laws and <br />,, %%/,."r,,.. <br />Regulations at t; y ffect cosh"Vogress, and performance of the Work. <br />D.�,�( (fRACTO t ,�?as c r f Il. �sUdigd all: (1) reports of explorations and tests of <br />F N.; r. <br />u6surtace conditiiians atbr 80" guous to the Site and all drawings of physical conditions <br />or relating to exss n` surface or subsurface structures at or contiguous to the Site <br />�,g g 9 <br />( �nepho e frou � Facilities) which have been identified in the Supplementary <br />Co di on r idee�,Jn paragraph 4.02 of the General Conditions and (2) reports and <br />On <br />drawings of a Haz�a005's- Environmental Condition, if any, at the Site which have been <br />M111% <br />identified in the SUPplementary Conditions as provided in paragraph 4.06 of the General <br />Conditions. ,Affir <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br />done so) all additional or supplementary examinations, investigations, explorations, tests, <br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities), <br />at or contiguous to the Site which may affect cost, progress, or performance of the Work <br />or which relate to any aspect of the means, methods, techniques, sequences, and <br />procedures of construction to be employed by CONTRACTOR, including applying the <br />specific means, methods, techniques, sequences, and procedures of construction, if any, <br />expressly required by the Contract Documents to be employed by CONTRACTOR, and <br />safety precautions and programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />@BCL@98055EE5 <br />00520-5 <br />C:\Users\GRANIC-1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@98055EE5\@BCL@9B055EE5.doc <br />P115 <br />