My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/02/2017
CBCC
>
Meetings
>
2010's
>
2017
>
05/02/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:32:50 PM
Creation date
6/12/2017 11:36:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/02/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order No. 2 <br />IRC COURTHOUSE JUDGES SECURITY UPGRADEā IRC Project No. 1621 <br />Page 3 of 5 <br />as required by Indian River County. We shall also review test results to be provided to our <br />office by the Contractor. We will provide our findings of said reviews to the Owner. <br />While reviewing the as -built survey and test results, we shall conduct an initial walk-through and <br />develop a punchlist of construction deficiencies. Our punchlist shall be provided to the Owner <br />for review and approval. Upon Owner's approval of said punchlist, we shall provide the <br />punchlist to the Contractor in order that the deficiencies may be corrected. It is understood the <br />Owner may develop an independent punchlist as well. Once the Contractor has satisfactorily <br />corrected the punchlist items and we are confident the site has been constructed in compliance <br />with permit approvals based on our review of the site, as -built survey, and test results, and the <br />Owner is satisfied with corrections, we shall submit a Certification of Construction Completion to <br />the City of Vero Beach and request final inspection. <br />In the event the City Inspector prepares a punchlist, we will provide said punchlist to the Owner <br />and Contractor in order that the deficiencies may be corrected. Once the City's punchlist has <br />been resolved to the Owner's and our satisfaction, we shall notify the City the site is ready for <br />re -inspection. <br />The As -built survey is not included in our fees. Daily and Periodic inspections of erosion <br />control devices and reports required by the NPDES General Permit are the Responsibility <br />of the Contractor and are not included in this proposal. <br />Engineering Certifications: Upon completion of the project and review of As -Built and Testing <br />results to confirm proper construction, Certifications will be prepared as follows: <br />1. Engineer's Certification to COVB Engineering Department <br />2. Engineer's Certification to COVB Planning Department <br />3. Engineer's Certification of Completion to Owner <br />4. Landscape Architect's Certification of Inspection and Material <br />5. Structural Engineer's Certification of Completion <br />6. Electrical Engineer's Certification of Completion <br />Any and all items not specifically set forth <br />excluded items include but are not limited to: <br />builts, and parking coordination. <br />SECTION III - COMPENSATION <br />in this Work Order are excluded. Specifically <br />testing of any kind, construction stake -out, as - <br />The COUNTY agrees to pay, and the ENGINEER agrees to accept a total lump sum of <br />$26,432.50 for the above-described services rendered as identified in Sections I and II of this <br />Work Order No. 2 based on the following: <br />Services During Project Bidding $ 4,587.50 <br />Masteller & Moler, Inc. $ 2,000.00 <br />ML Engineering, Inc. ($900.00 x 1.15) $ 1,035.00 <br />Treasure Coast Engineering ($700.00 x 1.15) $ 805.00 <br />Lucido & Associates ($650.00 x 1.15) $ 747.50 <br />P132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.