My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/02/2017
CBCC
>
Meetings
>
2010's
>
2017
>
05/02/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:32:50 PM
Creation date
6/12/2017 11:36:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/02/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M L Engineering Inc. <br />2030 371 Avenue <br />Vero Beach, Florida 32960 <br />Phone: (772) 569-1257 <br />Fax: (772) 569-4041 <br />EXHIBIT "B" — M L ENGINEERING, INC. FEE BREAKDOWN <br />April 12, 2017 <br />Mr. Steve Moler, P.E. <br />Masteller & Moler, Inc. <br />1655 27' Ave. Suite 2 <br />Vero Beach, Florida 32960 <br />Re: IRC Courthouse — Construction Administration <br />Vero Beach, Florida <br />Engineer's Project 16-210A <br />Dear Steve: <br />We are pleased to provide you with this proposal for structural engineering services on the above project. <br />Our scope of work will be to provide construction administration services for the structural portion of the <br />work for the proposed masonry screen walls at the East parking lot. <br />Scope of Work includes: <br />I Pre-bid meeting <br />2 Bid reviews <br />3 Pre -construction meeting <br />4 Submittal review of the following: <br />a. Concrete mix design <br />b. Masonry and accessories <br />c. Reinforcing <br />5 Construction observation, limited to (4) on-site visits for the following: <br />a. Foundation pre -pour. Verify compaction requirements are met, reinforcing size, quantity <br />and placement <br />b. Masonry walls. Verify and beam reinforcing, masonry placement, grouting and wall joints <br />c. Concrete slab. Verify compaction requirements are met and reinforcing <br />6. Payment reviews <br />7. Final inspection <br />The following services are not included in our scope: <br />1. Concrete or other material testing <br />2. Soil or compaction testing <br />3. Surveys <br />4. Permit fees <br />P135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.