My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/02/2017
CBCC
>
Meetings
>
2010's
>
2017
>
05/02/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:32:50 PM
Creation date
6/12/2017 11:36:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/02/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ongoing investigations, which included grab sampling of all incoming septage, porta-potty and grease <br />haulers for a period of 10 days in late March/early April 2017 at the RDF has confirmed that elevated <br />loading rates are entering the RDF prior to dewatering. After processing, the RDF liquid side stream <br />(centrate) flows to the WRWWTF and makes up a portion of that plant's influent (see Figure 2). IRCDUS's <br />industrial pretreatment limits nitrogen to 40mg/L, yet we have received loads of 4,000 mg/L. IRCDUS's <br />phosphorus limits are 20 mg/L, and we have received loads as high as 590 mg/L. <br />2. <br />Septic Hauler Total Nitrogen and Total Phosphorus <br />April 1-24, 2017 <br />4000 <br />3500 <br />3000 <br />2500 <br />J <br />to 2000 <br />E <br />1500 <br />1000 <br />500 <br />0 <br />Total Nitrogen Total Phosphorus Nitrogen Limit Phosphorus Limit <br />Page 2 of 8 <br />C:\Users\GRANIC-I\AppData\Local\Temp\BCL Tech nologies\easyPDF 7\@BCL@60050827\@BCL@6005C827.docx <br />P216 <br />
The URL can be used to link to this page
Your browser does not support the video tag.