Laserfiche WebLink
ATTACHMENT 3 <br />WORK AUTHORIZATION DIRECTIVE <br />No. 2017-004 <br />Heron Cay Mobile Home Park: Longpointe Court Water Main Replacement Project <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: April 21, 2017 EFFECTIVE DATE: May 9, 2017 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO.2015001, AWARDED September 9, 2014 <br />PROJECT: Longpointe Court Water Main Replacement <br />COUNTY UTILITY PROJECT NO.: UCP #N/A CONTRACTOR'S PROJECT NO.-, <br />COUNTY WIP. No. 471-169000-17518 <br />You are directed to proceed promptly with the following work: <br />Description: Construct new water main to serve existing homes along Longpointe Court in Heron Cay <br />MHP and abandon the existing water main. Project includes the construction of new water services and <br />connection of existing homes to.new system. <br />Attachments: Attachment 3 <br />Method of determining Contract Price: <br />0 Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />0 Lump Sum <br />0 Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost (rounded) _ <br />$59,334.17 <br />Estimated <br />90 days from NTP <br />Contract Time: <br />ACCEP <br />By: <br />Blue Goose Construction <br />Labor Contractor <br />Date: >" C 7 <br />RECOMM LADED: . <br />By:� c �— <br />John M. Bo r, P.E. <br />Utilities En ineer <br />Date: 3 �� <br />APPROVED: <br />By: <br />COUNTY, CHAIRMAN <br />Joseph E. Flescher <br />Date: <br />FAUlilitiesMILTTY - EngineeringTrojects - Utility Constriction Permits\IRC - Heron Cay - Longpointe WM RR\Admin\Agenda Item Work <br />Authorization No. 2017-004.doc <br />P97 <br />