My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/09/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
05/09/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:34:44 PM
Creation date
6/15/2017 9:49:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/09/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jones Pier - Sebastian, FL (FTC No.: 05 -039 -FF) <br />1. Survey (Existing Conditions) <br />The Consultant will utilize the existing boundary, tree and topographic survey by Carter <br />Associates, Inc. (CAI) as the base for the existing conditions for the area to receive the <br />improvements. It is understood that CAI has previously developed a boundary survey for <br />this location but additional topographic and tree survey information will be required for <br />design. Upon completion of the additional survey date, the survey will be provided to <br />Consultant in AutoCAD format to be utilized and relied upon for design. <br />2. Design Services <br />a. Construction Plans <br />The Consultant will prepare 24" x 36" design drawings signed & sealed, for the above <br />described improvements. The design drawings for the Jones Pier will include existing <br />conditions plan, site plan, paving, grading and drainage plan, utility plan, lift station <br />plan, erosion control plan, and applicable details plans. The plans package will also <br />include the necessary design calculations and reports for the lift station and minor <br />drainage as applicable. <br />b. Construction Cost Estimate <br />The Consultant will prepare estimates of probable construction costs (based upon <br />FDOT Basis. of Estimates) at approximately 60, 90 and 100 percent levels of design <br />completion. <br />C. County Reviews <br />The Consultant will attend three (3) progress review meetings with the COUNTY Parks <br />Division staff at approximately 60, 90 and 100 percent levels of design completion. A. <br />single set of review comments shall be provided to Consultant from COUNTY Parks <br />Division staff prior to each review meeting. <br />3. Permitting Services <br />The Consultant will prepare the following permit applications and associated submittals for <br />the following agencies: <br />• Indian River County Site Plan <br />• Indian River County ROW <br />• Indian River County Stormwater <br />• Indian River County Utilities <br />• Indian River County Fire Department <br />• FDEP Domestic Wastewater <br />• St. Johns River Water Management District ERP <br />It is understood that there is an existing wetlands area located in the middle of the parcel. Pursuant <br />to meetings and coordination with IRC Parks Division staff, it is understood that all wetland design, <br />permitting and coordination with applicable agencies will be provided by COUNTY. The Consultant <br />P109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.