My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/09/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
05/09/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:34:44 PM
Creation date
6/15/2017 9:49:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/09/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017038 Lateral D Canal Rehabilitation <br />Sample Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />Repair damage caused to the Lateral D Canal as a result of Hurricane Matthew, including.. <br />improvements to two valve box structures to prevent reoccurrence of similar damage. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: Lateral D Canal Rehabilitation <br />Bid Number: 2017038 <br />Project Address: 7420 eh Street, Vero Beach, Florida 32968. <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be fully completed (Final Completion) and ready for final payment on or before the <br />30th day from the date the Contract Time commences as set. forth in the Notice -to -Proceed. <br />Additionally, all Work within the Lateral D Canal shall be completed within 21 consecutive <br />calendar days once that Work begins within the canal. <br />3.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence for this Agreement and that <br />OWNER will suffer financial loss if (1) the Work is not completed on or before the time specified in <br />Article 5 above, plus any extensions thereof allowed; and (2) if Work within the Lateral D Canal is <br />not completed within 21 consecutive calendar days after said Work begins within the canal. The <br />parties also recognize the delays, expense, and difficulties involved in proving in a legal proceeding <br />Page 20 of 33 <br />P61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.