Laserfiche WebLink
��U�K��� <br />xno��nx�°� <br />EXHIBIT A <br />Proposal to Provide <br />Professional Engineering Services <br />for <br />Indian River County — GEC Work Order 05 <br />Phase 1 — Data Collection and Preliminary Planning <br />Wabasso Fishing Pier Demolition <br />Wabasso, Florida <br />Indian River County (County) has requested services in support of the Wabasso Fishing Pier Demolition <br />Project under the terms ofContinuing Contract Agreement for Professional Services (dated November 15. <br />2011) and Contract renewal (dated November 4, 2014). The Wabasso Fishing Pier was significantly <br />darnaged by the passing of Hurricane Matthew inearly October 20|6, causing the loss of 100' from the <br />525' west span and 300' from the 475' east span. The County has requested services to assist in the <br />environmental filed surveys, engineering planning and design, ponnithng, bidding, and construction <br />services for the full demolition of the Wabasso Fishing Pier. <br />It is anticipated that the demolition will include the following elements: <br />o <br />West Pier <br />• Removal of eight intact 50' pier span sections <br />• Removal of one intact 40' pier span section (at abutment) <br />• Removal o[two damaged/diap|uced/oubmerucd 50' pier span section <br />o Removal o[eleven intact pile pairs with caps <br />• Removal of]U0`ofupland sidewalk <br />o <br />East Pier <br />• Removal of three intact 50' pier span sections <br />o Removal of one intact 30' pier span section (at abutment) <br />• Removal ofsix dumugeJ/diap|uced/submerged 50' pier span section <br />" Removal offive intact pile pairs with caps <br />• Removal off'ive damaged/displaced/subrnerged pile pairs with caps <br />• Removal o(]00`ofupland sidewalk <br />These services are expected to be completed in three phases. This Task Order is for Phase 1 — Data <br />Collection and Preliminary Planning. Phase 2 will include design, permitting and bidding. The Phase 2 <br />scope and fee will be developed near the cornpletion of Phase 1. after the disposal site is secured and the <br />FEMA funding pararneters are identifled. Phase 3 will include construction related services. The Phase 3 <br />scope and fee will be developed near the completion of Phase 2, after the design and permitting are complete <br />and the FEMA funding parameters are set. <br />At the requesofthe County. Atkins (Engineer)has prepared this Phase 1 scope of services as foliows: <br />SECTION 1 PHASE 1 SCOPE OF SERVICES <br />TASK 1: FIELD DATA COLLECTION <br />The Enineer shall complete a field assessment of the project|o|ocateuodmopmuhoncrgedo:omunccm <br />(seagrass), and to locate and map debris froni the pier damage. The objective o[the xeagr000 <br />05 JUN 2017 <br />Page 1 of 3 <br />