My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-088
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 3:59:31 PM
Creation date
6/16/2017 3:56:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/13/2017
Control Number
2017-088
Agenda Item Number
8.G.
Entity Name
Atkins North America
Subject
Wabasso Fishing Pier Demolition Project
Area
Work Order No. 5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��U�K��� <br />xno��nx�°� <br />EXHIBIT A <br />Proposal to Provide <br />Professional Engineering Services <br />for <br />Indian River County — GEC Work Order 05 <br />Phase 1 — Data Collection and Preliminary Planning <br />Wabasso Fishing Pier Demolition <br />Wabasso, Florida <br />Indian River County (County) has requested services in support of the Wabasso Fishing Pier Demolition <br />Project under the terms ofContinuing Contract Agreement for Professional Services (dated November 15. <br />2011) and Contract renewal (dated November 4, 2014). The Wabasso Fishing Pier was significantly <br />darnaged by the passing of Hurricane Matthew inearly October 20|6, causing the loss of 100' from the <br />525' west span and 300' from the 475' east span. The County has requested services to assist in the <br />environmental filed surveys, engineering planning and design, ponnithng, bidding, and construction <br />services for the full demolition of the Wabasso Fishing Pier. <br />It is anticipated that the demolition will include the following elements: <br />o <br />West Pier <br />• Removal of eight intact 50' pier span sections <br />• Removal of one intact 40' pier span section (at abutment) <br />• Removal o[two damaged/diap|uced/oubmerucd 50' pier span section <br />o Removal o[eleven intact pile pairs with caps <br />• Removal of]U0`ofupland sidewalk <br />o <br />East Pier <br />• Removal of three intact 50' pier span sections <br />o Removal of one intact 30' pier span section (at abutment) <br />• Removal ofsix dumugeJ/diap|uced/submerged 50' pier span section <br />" Removal offive intact pile pairs with caps <br />• Removal off'ive damaged/displaced/subrnerged pile pairs with caps <br />• Removal o(]00`ofupland sidewalk <br />These services are expected to be completed in three phases. This Task Order is for Phase 1 — Data <br />Collection and Preliminary Planning. Phase 2 will include design, permitting and bidding. The Phase 2 <br />scope and fee will be developed near the cornpletion of Phase 1. after the disposal site is secured and the <br />FEMA funding pararneters are identifled. Phase 3 will include construction related services. The Phase 3 <br />scope and fee will be developed near the completion of Phase 2, after the design and permitting are complete <br />and the FEMA funding parameters are set. <br />At the requesofthe County. Atkins (Engineer)has prepared this Phase 1 scope of services as foliows: <br />SECTION 1 PHASE 1 SCOPE OF SERVICES <br />TASK 1: FIELD DATA COLLECTION <br />The Enineer shall complete a field assessment of the project|o|ocateuodmopmuhoncrgedo:omunccm <br />(seagrass), and to locate and map debris froni the pier damage. The objective o[the xeagr000 <br />05 JUN 2017 <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.