My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-088
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 3:59:31 PM
Creation date
6/16/2017 3:56:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/13/2017
Control Number
2017-088
Agenda Item Number
8.G.
Entity Name
Atkins North America
Subject
Wabasso Fishing Pier Demolition Project
Area
Work Order No. 5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKI N S <br />SECTION 2 ASSUMPTIONS AND EXCLUSIONS <br />1. Application fees, impact fees and any other fees required by regulatory agencies are considered a direct <br />expense to the County and are not included in this scope and fee. <br />2. It is assumed the pedestrian bridge to be demolished is owned by the County, and that coordination <br />with, or approvals from, FDOT will not be required for its removal. <br />3. It is assumed that the demolition work will be managed form the waterside (i.e. a barge) and that no <br />work will be conducted from the highway bridge. If it is determined that work will be done from the <br />highway bridge, coordination and approval from FDOT may be required. Such coordination and <br />approval would be outside this scope of services and would be considered an additional service. <br />4. It is understood that the County is pursuing regulatory approval for disposal of the pier demolition <br />debris at an offshore location. This work is being done by internal County staff and assistance from <br />the Engineer is not included in this scope of services. <br />5. The ultimate decisions related to regulatory approvals and finding assistance lie outside of the <br />Engineer's control. The Engineer cannot guarantee regulatory approvals or funding assistance. <br />6. Only those services specifically mentioned in Section 1 are included with this scope of services. <br />Additional services, if required, can be provided at an agreed upon lump sum fee or at the standard <br />hourly rates. <br />7. FEMA assistance is excluded from this scope of services. It is understood that County staff is <br />currently working with FEMA personnel to determine the best approach to funding assistance for the <br />pier demolition work. FEMA assistance can be added to subsequent task orders if requested by the <br />County. <br />SECTION 3 SCHEDULE & DELIVERABLES <br />The following schedule is anticipated for the completion of each task (week number measured from <br />receipt of a notice to proceed): <br />Task 1: Field Data Collection <br />Task 2: Preliminary Planning <br />Week 8 <br />Week 12 <br />The following deliverables will be provided to the County: <br />A. Field Data Collection Report (via electronic file transfer — pdf). <br />B. Preliminary Plan Set and Cost Estimate (via electronic file transfer — pdf). <br />SECTION 4 COMPENSATION <br />The proposed scope of services will be provided on a lump sum basis administered pursuant to the <br />provisions of our master contract and invoiced monthly based on the percentage of completion of the overall <br />project. Invoices will also include and hourly break down of cost for FEMA reimbursable Direct <br />Administrative Costs. <br />Task 1: Field Data Collection <br />Task 2: Preliminary Planning <br />$ 29,650.00 <br />$ 19,550.00 <br />TOTAL $ 49,200.00 <br />Page 3 of 3 <br />05 JUN 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.