My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/12/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
07/12/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 10:12:36 AM
Creation date
6/28/2017 10:58:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/12/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />Bid No. 2016032 <br />South County Water Treatment Plant Well No. 7 Raw Water Pipeline <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Blue Goose Construction, LLC (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents <br />as set forth in Article 8 of this Contract. The Work is generally described as follows: <br />Contractor as an independent contractor and not as an employee shall furnish and complete all <br />of the necessary labor, material and equipment to perform the work as specified or indicated in <br />the Contract Documents and per FDEP, the Indian River County Department of Utility Services <br />and County Engineering Department standards. The work is generally described as follows: <br />The proposed work generally consists of furnishing all labor, materials, tools and equipment to <br />construct approximately 1,350 LF of 12 -inch PVC watermain, construct approximately 210 LF of <br />16 -inch HDPE water main via horizontal directional drill under the park entrance, and install all <br />necessary fittings and restraints shown on the project plans. All work will include maintaining <br />traffic control, complete restoration and all other appurtenant and miscellaneous related items <br />and work for a completed project. It is the intent of the Indian River County Department of Utility <br />Services to obtain complete and working installations under this contract and any items of labor, <br />equipment, and materials that may reasonably be assumed as necessary to accomplish this end <br />shall be supplied whether or not they are specifically stated herein. All work as shown on the <br />construction plans will be done in accordance with the Indian River County Department of Utility <br />Services Water & Wastewater Utility Standards, (December 2015) or latest edition, unless <br />specified differently in the individual Work Authorizations or changed by the Engineer or his <br />representative. The work is located in the South County Park directly east of the South County <br />Water Treatment Plant on 20th Avenue, North of Oslo Road. <br />The construction of the utility improvements described above shall also consist of, but not limited <br />to: resetting of existing facilities disturbed during construction; utilities exploration; coordination <br />with any permitting agencies; trenching; clearing and tree removal; dewatering; installation of <br />pipe, structures and all appurtenances; fittings and restrainers; soil backfill compaction; testing; <br />(including backfill and subgrade testing); road, landscape and driveway restoration; re -grading <br />and grassing (sod); mobilization, demobilization and traffic control. No excavation shall be left <br />open when work is not actively being performed. Construction fencing used in the work area shall <br />not block sight distance near intersections or driveways. All construction equipment and materials <br />shall be stored in a manner that does not disrupt park operations. The park entrance shall remain <br />open and operational throughout construction. <br />Section 00530-1 <br />84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.